Click here for Adobe Acrobat version
********************************************************
NOTICE
********************************************************
This document was converted from a PDF version
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Federal Communications Commission FCC 23-81
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
Lumen Technologies, Inc. ) File No.: EB-SED-22-00034071
) NAL/Acct. No.: 202432100001
) FRN: 0018626853
NOTICE OF APPARENT LIABILITY FOR FORFEITURE
Adopted: October 12, 2023 Released: October 17, 2023
TABLE OF CONTENTS
By the Commission: Commissioner Gomez not participating. Paragraph #
I. INTRODUCTION .................................................................................................................................. 1
II. BACKGROUND .................................................................................................................................... 5
A. Legal Framework ............................................................................................................................. 5
B. Factual Background ....................................................................................................................... 10
1. Investigation ............................................................................................................................ 11
2. First 911 Outage in South Dakota ........................................................................................... 12
3. Second 911 Outage in North Dakota ....................................................................................... 21
C. Lumens Prior 911 Outage-Related Consent Decrees ................................................................... 31
III. DISCUSSION ...................................................................................................................................... 32
A. Lumen Apparently Violated Section 4.9(f) of the Commissions Rules for Both Outages. .......... 33
B. Lumen Apparently Violated Section 9.4 of the Commissions Rules for the Second 911
Outage. ........................................................................................................................................... 37
C. Proposed Forfeiture ........................................................................................................................ 46
1. Forfeiture Assessment on a Per Call (Section 9.4 Apparent Violations) and Per PSAP
Basis (Section 4.9 Apparent Violations) ................................................................................. 47
2. Base Forfeiture Applied .......................................................................................................... 52
3. Upward Adjustments ............................................................................................................... 53
4. Downward Adjustments .......................................................................................................... 57
IV. CONCLUSION .................................................................................................................................... 59
V. ORDERING CLAUSES ....................................................................................................................... 60
I. INTRODUCTION
1. We propose a penalty of $867,000 against Lumen Technologies, Inc. (Lumen or
Company) for apparently willfully and repeatedly failing to reasonably design and operate its network to
transmit all 911 calls, and to notify, as soon as possible Public Safety Answering Points (PSAPs) for
two 911 outages that occurred in February 2022.1 The PSAP notification apparent violations occurred in
both outages. The 911 call transmission apparent violations occurred in the second outage.
2. On February 17, 2022, Lumen experienced an outage affecting 911 calls in South Dakota
that lasted for almost five hours (First 911 Outage). Because of flaws in its system to notify PSAPs,
Lumen did not notify the two affected PSAPs until days after the outage had ended. On February 22,
1 See 47 CFR 4.9(f), 9.4. For purposes of brevity, we use the term PSAP to refer to all of the appropriate
authorities identified by sections 4.9 and 9.4 of the Commissions rules.
Federal Communications Commission FCC 23-81
2022, Lumen experienced another 911 outage, this time related to its Bismarck, North Dakota switch
(Second 911 Outage). This outage disrupted 911 service for more than seven hours in North Dakota.
Similarly, because of flaws in its PSAP notification system, Lumen managed to notify only two of eleven
affected PSAPs in a timely manner. This outage resulted in hundreds of calls failing to reach 911
emergency call centers.
3. Such failures are not acceptable. We propose a penalty of $867,000 against Lumen for
apparently violating sections 4.9 and 9.4 of the Commissions rules by failing to notify PSAPs in a timely
manner of the 911 outages and by deploying a system that was insufficient to transmit all 911 calls
reliably to PSAPs in the Second 911 outage. Lumen apparently willfully and repeatedly violated our
rules and created a significant threat to the life and property of tens of thousands of people.
II. BACKGROUND
A. Legal Framework
4. The 911 Statute. Congress passed the Wireless Communications and Public Safety Act
(911 Act) in 1999 and directed the Commission to make 911 the universal emergency telephone number
in the United States for wireline and wireless telephone service for reporting an emergency to
appropriate authorities and requesting assistance.2 Congress identified the critical importance of 911
service reliability in defining the purpose of the 911 Act as to encourage and facilitate the prompt
deployment throughout the United States of a seamless, ubiquitous, and reliable end-to-end infrastructure
for communications, including wireless communications, to meet the nations public safety and other
communications needs.3
5. The FCCs 911 Rules. It is a bedrock principle embedded in the Commissions rules that
reliable 911 service must be available to all consumers at all times. Even before Congress passed the 911
Act, the Commission was committed to advancing our countrys wireline and wireless 911 networks.4
That commitment grew following the passage of the 911 Act, with the Commission adopting numerous
rules intended to ensure seamless, ubiquitous, and reliable 911 service nationwide.5 In this regard, section
2 47 U.S.C. 251(e)(3); see Wireless Communications and Public Safety Act of 1999, Pub. L. No. 106-81, 113 Stat.
1286 (1999) (codified at 47 U.S.C. 222, 251, 615) (911 Act).
3 911 Act 2(b) (codified at 47 U.S.C. 615 note). Congress found that the construction and operation of
seamless, ubiquitous, and reliable wireless telecommunications systems promote public safety and provide
immediate and critical communications links among members of the public; emergency medical service providers
and emergency dispatch providers; public safety, fire service and law enforcement officials; transportation officials,
and hospital emergency and trauma care facilities. Id. 2(a)(6) (codified at 47 U.S.C. 615 note).
4 The Commissions rules have long emphasized the importance of 911 network reliability. See, e.g., Revision of the
Commissions Rules to Ensure Compatibility with Enhanced 911 Emergency Calling Systems, Report and Order and
Further Notice of Proposed Rulemaking, 11 FCC Rcd 18676, 18678, para. 1 (1996) (E911 Rules Order) (911 rules
adopted to foster major improvements in the quality and reliability of 911 services).
5 See Implementation of 911 Act, Fifth Report and Order, Memorandum Opinion and Order on Reconsideration, 16
FCC Rcd 22264, 22265, para. 1 (2001) (These actions will make emergency dialing for consumers traveling across
the country simpler, will assist carriers in delivering 911 calls more promptly, and thus, will improve the response of
public safety entities and emergency services personnel in their efforts to save lives.); Implementation of the NET
911 Improvement Act of 2008, Report and Order, 23 FCC Rcd 15884, 15884, para. 1 (2008) (issuing rules giving
interconnected VoIP providers rights of access to 911 and E911 capabilities); See Improving 911 Reliability;
Reliability and Continuity of Communications Networks, Including Broadband Technologies, Report and Order, 28
FCC Rcd 17476, 17477, para. 1 (2013) (911 Reliability Report and Order) (adopting rules to improve the
reliability and resiliency of 911 communications networks nationwide by requiring that 911 service providers take
reasonable measures to provide reliable 911 service, as evidenced by an annual certification); Wireless E911
Location Accuracy Requirements, Fourth Report and Order, 30 FCC Rcd 1259, 126162, para. 6 (2015) (adopting
indoor location accuracy rules for 911 calls); Ensuring Continuity of 911 Communications, Report and Order, 30
FCC Rcd 8677, 8678 (2015) (implementing rules to ensure that callers have access to 911 during power outages);
(continued.)
2
Federal Communications Commission FCC 23-81
9.4 of the Commissions rules requires telecommunications carriers to transmit all 911 calls to a PSAP or
other appropriate entity.6 In addition, section 4.9(f) of the Commissions rules requires wireline service
providers to notify PSAPs as soon as possible of an outage that potentially affects PSAPs and convey to
them all available information that may be useful to the management of the affected facility in mitigating
the effects of the outage . . . .7
6. Best Practices. To establish accepted industry standards for network design, operation,
and maintenance, the Commissions Communications Security, Reliability and Interoperability Council
(CSRIC) publishes a series of best practices. CSRIC includes members from both industry and public
safety organizations and has developed, among other things, network-reliability best practices. CSRIC
has published several practices that are relevant in assessing the reasonableness of Lumens conduct in
connection with the 911 Outages and are discussed in detail in section III.A, below. These CSRIC best
practices relate to training, network monitoring, and proper follow-up procedures.8 Although
implementation of CSRIC best practices is not mandatory, it may prove valuable in evaluating the
reasonableness of a partys actions.
7. Legacy 911 Call Network Architecture. The function of the 911 network is to route an
emergency call quickly, efficiently, and reliably from the caller to the PSAP that serves the callers
location.9 In the legacy 911 call flow, a 911 call traditionally begins with the originating service provider
(OSP) of the 911 caller transmitting the 911 call, along with caller location, calling party numbering data
and other relevant information, to a selective router (or its functional equivalent)10 operated by a covered
911 service provider.11 The OSP thus has the responsibility to transmit the 911 call to the appropriate
selective router based on the callers location.12 The covered 911 service provider, which may or may not
be the same entity as the OSP, then has the responsibility to translate and route the 911 call from the
selective router (or its equivalent) to the appropriate PSAP.13
8. Agency Law. Section 217 of the Communications Act of 1934, as amended (the Act),
states that common carriers are responsible for the acts and omissions of any officer, agent, or other
person acting for or employed by any common carrier.14 In the context of 911 systems, the Commission
has made clear this means that telecommunications carriers and other providers retain responsibility when
Implementing Karis Law and Section 506 of RAY BAUMS Act, Report and Order, 34 FCC Rcd 6607, 6608 (2019)
(implementing direct 911 dialing and notification requirements for multi-line telephone systems and IP-based
systems); Amendments to Part 4 of the Commissions Rules Concerning Disruptions to Communications; Improving
911 Reliability; New Part 4 of Commissions Rules Concerning Disruptions to Communications, Second Report and
Order, FCC 22-88, 2022 WL 17100963 (rel. Nov. 18, 2022) (Part 4 Second R&O).
6 See 47 CFR 9.4 (All telecommunications carriers shall transmit all 911 calls to a PSAP, to a designated
statewide default answering point, or to an appropriate local emergency authority as set forth in 9.5.).
7 See id. 4.9(f).
8 CSRIC best practices are available at: https://opendata fcc.gov/Public-Safety/CSRIC-Best-Practices/qb45-
rw2t/data. See infra notes 108-112, 115-116 for application of specific best practices in this case.
9 See, e.g., E911 Rules Order, 11 FCC Rcd at 18678, para. 3 (observing that [d]ialing 911 is the most effective and
familiar way the American public has of finding help in an emergency).
10 The selective router identifies the appropriate destination PSAP for a 911 call based on the location associated
with the callers automatic number information and routes it to that PSAP. See 911 Reliability Report and Order, 28
FCC Rcd at 17478, para. 7.
11 See 47 CFR 9.19(a)(4).
12 See e.g., 911 Reliability Report and Order, supra note 5, at 17478, para. 7.
13 See 47 CFR 9.19(a)(4); 911 Reliability Report and Order, supra note 5, at 17488, para. 36.
14 47 U.S.C. 217; see also id. 153(51) (A telecommunications carrier shall be treated as a common carrier only
to the extent that it is engaged in providing telecommunications services[.]).
3
Federal Communications Commission FCC 23-81
they rely on contractors[t]he Commission has long held that licensees and other regulatees are
responsible for the acts and omissions of their employees and independent contractors.15 The
Commission has also recognized that under long established principles of common law, statutory duties
are nondelegable.16
B. Factual Background
9. Lumen is a publicly traded, multi-national corporation that, through affiliates, operates,
among others, wireline telephone networks in many parts of the United States, including North and South
Dakota.17 Moreover, the outages at issue took place within Lumens wireline networks.18 In this
capacity, Lumen states that it meets the statutory definition of a telecommunications carrier in those
two states.19 On February 17 and February 22, 2022, Lumen experienced two network outages that
adversely impacted its provision of 911 service in South and North Dakota, respectively.
1. Investigation
10. The Commissions Public Safety and Homeland Security Bureau (PSHSB) referred the
outages to the Enforcement Bureau (Bureau) for investigation. On July 27, 2022, the Bureau's Spectrum
Enforcement Division (SED) issued a letter of inquiry to Lumen.20 On September 2, 2022 and October 7,
2022, Lumen submitted responses to SED.21 On November 7, 2022, SED issued a follow-up letter of
inquiry to Lumen.22 On November 30, 2022, Lumen submitted follow-up responses to SED.23 On
January 6, 2023, SED issued a second follow-up letter of inquiry to Lumen.24 On January 27, 2023,
Lumen submitted responses to the second follow-up letter of inquiry.25
2. First 911 Outage in South Dakota
11. On February 16, 2022, at approximately 5:51 AM Central Standard Time (CST), a switch
card failed at a signaling transfer point (STP) link, Path A St. Paul (STP Path A), at Lumens Pierre
15 Part 4 Second R&O, 2022 WL 17100963, at *6, para. 13 (quoting Eure Family Limited
Partnership, Memorandum Opinion and Order, 17 FCC Rcd 21861, 21863-64 (2002) (citing MTD, Inc.,
Memorandum Opinion and Order, 6 FCC Rcd 34, 35 (1991), Wagenvoord Broadcasting Co., Memorandum Opinion
and Order, 35 F.C.C.2d 361 (1972))).
16 Id.
17 Response to Letter of Inquiry, from Lumen Technologies, Inc., to Spectrum Enforcement Division, FCC
Enforcement Bureau, at 4-5, Ex. 1-1 (Sept. 2, 2022) (September 2 LOI Response); Response to Letter of Inquiry,
from Lumen Technologies, Inc., to Spectrum Enforcement Division, FCC Enforcement Bureau, and supporting
documents, at 5 (Oct. 7, 2022) (October 7 LOI Response) (both on file in EB-SED-22-00034071).
18 September 2 LOI Response at 3; October 7 LOI Response at 8.
19 September 2 LOI Response at 5; October 7 LOI Response at 5.
20 Letter of Inquiry, from FCC Enforcement Bureau, to Lumen Technologies, Inc. (June 27, 2022) (on file in EB-
SED-22-00034071) (LOI).
21 See generally Lumen September 2 and October 7 LOI Responses.
22 See E-mail, Spectrum Enforcement Division, FCC Enforcement Bureau, to Lumen Technologies, Inc. (Nov. 11,
2022, 11:20 AM EST) (on file in EB-SED-22-00034071).
23 See Response to Follow-up Letter of Inquiry, from Lumen Technologies, Inc., to Spectrum Enforcement Division,
FCC Enforcement Bureau, and supporting documents (Nov. 30, 2022) (on file in EB-SED-22-00034071) (FLOI
Response).
24 See E-mail, Spectrum Enforcement Division, FCC Enforcement Bureau, to Lumen Technologies, Inc. (Jan. 6,
2023, 9:36 AM EST) (on file in EB-SED-22-00034071).
25 See Response to Second Follow-up Letter of Inquiry, from Lumen Technologies, Inc., to Spectrum Enforcement
Division, FCC Enforcement Bureau, and supporting documents (Jan. 27, 2023) (on file in EB-SED-22-00034071)
(Second FLOI Response).
4
Federal Communications Commission FCC 23-81
Switch in South Dakota.26 Such switch cards provide an interface to the STP links on the Signaling
System 7 (SS7) portion of Lumens network. SS7 is an integral part of Lumens wireline
communications network and is necessary for call set-up, routing, and completion, as well as for network
management between interconnected SS7 networks.27
12. When the card failed, Lumen received an alarm indicating that STP Path A was no longer
functioning.28 This indicated to Lumen that the network lost redundancy for the STP links.29 The alarm
did not indicate the specific issue that caused STP Path A to fail.30 Moreover, the Bureaus investigation
did not find any record of Lumen attempting to trouble shoot the cause of the failure at this time.31
13. Twenty-four hours later, February 17, 2022, at approximately 5:50 AM CST, the switch
card failed at the second STP link for the Pierre Switch, Path B Minneapolis (STP Path B). At that
time, Lumen received an alarm indicating that STP Path B was down.32 Because both STP paths were
down, SS7 was no longer functioning at the Pierre Switch.33 Consequently, calls designated for
destinations outside of the Pierre Switchs local calling area could not be completed. This, in turn, caused
911 service in that area to fail because 911 calls there had to travel outside the switchs local calling area
to NG911 facilities to be processed.34
14. Lumen became aware of the First 911 Outage at 5:50 AM CST, when the second STP
link failed.35 But Lumen did not yet know the underlying cause of the outage. An hour later, at 6:50 AM
CST, Lumen dispatched a technician to the Pierre Switch.36 The technician determined that the two failed
switch cards at the Pierre Switchone for STP Path A and one for STP Path Bwere the root cause of
the failure of the two STP links and thus the outage. Lumen had warehoused switch cards onsite, and the
technician replaced the failed cards restoring service at 10:43 AM CST.37
15. The First 911 Outage lasted almost five hours and potentially affected the ability of up to
14,339 Lumen wireline customers to call 911.38 However, Lumen reports that none of these customers
attempted to call 911 during the outage, and there were, consequently, no failed 911 calls during this
outage.39
16. Lumen states that, under its standard procedures, the alarm related to a switch card failure
would generate a trouble ticket to notify the Lumen network operations center of an SS7 isolation and
potential 911 impact. That ticket would then have enough information to trigger distribution of an
automated PSAP notification to the appropriate PSAP(s) with accurate information about the network
26 September 2 LOI Response, supra note 17, at 2, 7.
27 Id. at 2.
28 Id. at 9.
29 FLOI Response, supra note 23, at 5.
30 September 2 LOI Response, supra note 17, at 9.
31 FLOI Response, supra note 23, at 3.
32 September 2 LOI Response, supra note 17, at 9.
33 FLOI Response, supra note 23, at 5.
34 September 2 LOI Response, supra note 17, at 2.
35 Id. at 9; FLOI Response, supra note 23, at 3.
36 FLOI Response, supra note 23, at 3, 4.
37 September 2 LOI Response, supra note 17, at 2, 6.
38 Id. at 1.
39 Id. at 2.
5
Federal Communications Commission FCC 23-81
event. However, the ticket obtains its information from various Lumen systems.40 These systems work
together to determine the appropriate PSAP(s) to be notified in response to different network events.
During the First 911 Outage, the ticket that was generated from the Path B STP Minneapolis link failure
contained insufficient information due to a data flow problem that populated the ticket with incomplete
and invalid information. While this data flow is generally automated, the automated data flow did not
occur in that instance. Lumen has been unable to determine the reason(s) for this.41
17. When the automated data flow fails, Lumens process is for {[
]} At the time of the First 911 Outage,
however, {[
]} Simply put, {[
]} incorrectly interpreted the information Lumen had received, which resulted in incorrect
information being passed on. Without the correct information, Lumens systems could not determine the
location of the impacted switch card and the associated PSAP impacts. As a result, automatic PSAP
notification distribution failed to occur.42
18. When an automatic PSAP notification distribution fails, Lumen claims its standard
procedure {[
]} However, the appropriate follow-up from the Public Safety Service team did not
occur at the time of the First 911 Outage. Rather, a Public Safety Service team member saw the
automated PSAP notification failure but cancelled the PSAP notification ticket as the Public Safety
Service team member mistakenly decided the automated PSAP notification failure had been generated in
error given the incomplete and invalid {[ ]} information it contained.43
19. The following day, after the First 911 Outage had been resolved, a member of Lumens
outage reporting team reviewed the restore time of that outage and noticed that the PSAP notification
ticket looked unusual.44 Data fields that should have been populated in the ticket were not populated.45
Through subsequent internal review, Lumen then determined that 911 service would have been impacted
by the First 911 Outage, that automated PSAP notifications should have been triggered but were not, and
ultimately discovered the foregoing causes of these problems.46 Lumen also determined there had been a
911 service impact to two PSAPs in South Dakota and PSAP notifications had not been sent. Lumen sent
PSAP notifications at that time, i.e., five days after the First 911 Outage had ended.47
3. Second 911 Outage in North Dakota
20. Five days after the First 911 Outage, Lumen experienced a 911 outage in North Dakota
that impacted all calls that relied on SS7 including all 911 calls in the area. On February 19, 2022,
Lumen noticed network instability on an STP path serving Lumens Bismarck, Dickinson and Mandan
switches. Lumen deactivated this STP path to these three switches for testing. Lumens second STP link
to these switches stayed open so calls continued to complete as normal. After testing was completed, the
40 Id. at 15.
41 Id. at 16.
42 Id. at 16. Material in this paragraph and in the remainder of the NAL set off by double brackets {[ ]} is
confidential and is redacted from the public version of this document.
43 Id. at 16.
44 Id. at 17; FLOI Response, supra note 23, at 5.
45 FLOI Response, supra note 23, at 6.
46 September 2 LOI Response, supra note 17, at 17.
47 Id. at 3.
6
Federal Communications Commission FCC 23-81
Lumen technician failed to reactivate the first STP path for the Bismarck and Mandan switches (but
reactivated the path for the Dickinson switch). However, the switches continued to function over the
second STP path but with no redundant STP path.48
21. The second STP path relied on two diverse fiber transport circuits operated by a third-
party contractor, one through Fargo, ND (Fargo Transport Path) and one through Chicago, IL (Chicago
Transport Path).49 On February 21, 2022, at approximately 12:18 PM CST, a fiber cut occurred on the
Chicago Transport Path near Henderson, Colorado.50 The next morning, on February 22, 2022, the Fargo
Transport Path began to experience HVAC problems.51 Equipment was overheating and shutting down,
affecting traffic flow over the path.52 However, Lumen was unaware at the time of either the fiber cut on
the Chicago Transport Path or the serious HVAC issues on the Fargo Transport Path. In fact, Lumen
claims it did not become aware of the HVAC problem on the Fargo Transport Path until about 30 minutes
after the outage actually ended. And Lumen claims it did not learn about the fiber cut on the Chicago
Transport Path until about an hour and forty-five minutes after the outage had ended.53
22. On February 22, 2022, at 8:15 AM CST, problems with Lumens traffic on the Fargo
Transport Path reached a sufficient threshold to generate a loss of redundancy alarm for the loss of the
Chicago Transport Path.54 Then, at 9:00 AM CST, Lumen received an alert indicating an SS7 outage
condition.55 This SS7 connectivity loss began the Second 911 Outage, preventing the transmission of 911
calls to 11 PSAPs in Western North Dakota.56
23. Lumen initially told the Bureau that the fiber cut on the Chicago Transport Path caused
the second STP path to fail for the Bismarck and Mandan, ND switches, in turn causing the loss of SS7
connectivity that occurred at 9:00 AM CST.57 During the course of this investigation, the Bureau inquired
why the complete loss of SS7 connectivity occurred a substantial time after that fiber cut.58 Although
Lumen has been unable to explain how the outage occurred, the Company speculated that the Fargo
Transport Path was still at least partially functional and may have continued to allow the second STP path
to operate until the HVAC issue degraded service on [it] and contributed to the SS7 connectivity failure
Lumen experienced at approximately 9:00 AM CST.59
24. At approximately 10:45 AM CST a Lumen technician restored the first STP path SS7
connectivity to the Bismarck and Mandan switches, ending this phase of the outage.60 However, at 11:10
48 October 7 LOI Response, supra note 17, at 2.
49 Id. at 2.
50 FLOI Response, supra note 23, at 9.
51 October 7 LOI Response, supra note 17, at 3.
52 Id. at 11.
53 FLOI Response, supra note 23, at 12.
54 Id. at 9-10; Second FLOI Response, supra note 25, at 5. Lumen had implemented {[
]} Id.
55 FLOI Response, supra note 23, at 10.
56 October 7 LOI Response, supra note 17, at 2. These 11 PSAPs were the {[
]}. Id., fn 3.
57 See Letter from Lumen Technologies, Inc., to Spectrum Enforcement Division, FCC Enforcement Bureau, at 4
(March 9, 2022) (on file in EB-SED-22-00034071) (March 9 Non-compliance Report).
58 LOI, supra note 20, at 10.
59 Id. at 10; FLOI Response, supra note 23, at 11.
60 October 7 LOI Response, supra note 17, at 2-3.
7
Federal Communications Commission FCC 23-81
AM CST, the same HVAC issue caused the Fargo transport path to shut down, ending traffic flow over
the path.61 At that time, Lumen received a network alarm, which indicated that traffic was failing on the
third partys fiber transport network. Thus, Lumen was then aware that both the Fargo and Chicago
Transport Paths, on which the second STP path relied, were non-operational.62 Again, however, the alarm
{[ ]}63
25. This did not disrupt all SS7 communications again because earlier the Lumen technician
had restored the first STP path, but it did cease all 911 traffic to the impacted PSAPs. At the time of the
outage, the Bismarck switch was a component of Lumens legacy wireline network and previously served
as a selective router for 911 calls.64 With the transition to NG911, selective routing no longer occurred at
Lumens Bismarck switch at the time of the Second 911 Outage, but the ingress architecture remained.
Lumen, which billed the {[ ]} for this part of the 911 call flow,
maintained the Bismarck office as an ingress point for 911 calls going into North Dakotas NG911
network.65 As part of this ingress, Lumens Emergency Service (ES) trunks, which ran from the
Bismarck switch to North Dakotas NG911 network,66 used the same two fiber transport paths as the
second STP path, i.e., the Fargo and Chicago Transport Paths.67 Because Lumen designed its Bismarck
switch to serve as the required ingress point for delivery to the NG911 network for 911 traffic from
multiple originating service providers, who had no alternative route available to reach the NG911
network, the failure of the Fargo and Chicago Paths resulted in 911 service stopping at Lumens Bismarck
switch.68 This affected the same 11 PSAPs as had been affected by the earlier loss of SS7 connectivity.69
26. On February 22, 2022, at approximately 4:08 PM CST, the third-party transport carrier
resolved the HVAC issues in Fargo and 911 services resumed due to the restoration of the Fargo
Transport Path.70
27. The following provides an overview of the timeline for the Second 911 Outage.
Second 911 Outage Timeline
February 19, 2022
A Lumen technician deactivates one of two SS7 links at Lumens Bismarck switch and
then fails to reactivate it. Lumen remains unaware this link is deactivated until a related
911 outage begins three days later.
61 Id. at 3, 11.
62 FLOI Response, supra note 23, at 10.
63 Id.
64 October 7 LOI Response, supra note 17, at 8, 11, 13. See also Inquiry Concerning 911 Access, Routing, and
Location in Enterprise Communication Systems, PS Docket 17-239, Notice of Inquiry, 32 FCC Rcd 7923, 7939,
Appendix A (Wireline carriers accomplish [routing of 911 calls to PSAPs] by use of selective routers to receive
911 calls from LEC [Local Exchange Carrier] central offices over dedicated trunks.).
65 October 7 LOI Response, supra note 17, at 8, 13.
66 Id. at 3; FLOI Response, supra note 23, at 11.
67 October 7 LOI Response, supra note 17, at 3, n.4.
68 Id. at 8.
69 Id. at 17.
70 Id. at 3.
8
Federal Communications Commission FCC 23-81
February 21, 2022
At approximately 12:18 PM CST a fiber cut occurs on one of the two, third-party fiber
optic paths (Chicago Transport Path) supporting the second, active SS7 link at Lumens
Bismarck switch.
February 22, 2022
Morning due to HVAC issues, the other fiber optic path (Fargo Transport Path)
supporting the second, active SS7 link at Lumens Bismarck switch begins to experience
problems.
8:15 AM CST Lumen receives a loss of redundancy alarm indicating the Chicago
Transport Path is down about 20 hours after the fiber cut occurred.
9:00 AM CST the HVAC problems on the Fargo Transport Path reach a sufficient
degree to cut-off SS7 transmission to the second SS7 link at the Bismarcks switch,
thereby starting a 911 outage.
9:07 AM CST Lumen notifies two of the eleven affected PSAPs.
9:32 9:53 AM CST Lumen notifies three more of the eleven affected PSAPs {[
]}.
10:45 AM CST this SS7 outage ends when a Lumen technician reactivates the first,
deactivated SS7 link at Lumens Bismarck switch.
11:10 AM CST the HVAC issue on the Fargo Transport Path now completely shuts
down that path. With both the Chicago and Fargo Transport Paths down, Lumens
Bismarck switch is now disconnected from North Dakotas NG911 network, preventing
911 calls from reaching that network.
12:21 12:30 PM CST Lumen notifies the remaining six affected PSAPs.
At approximately 4:08 PM CST the 911 outage ends when the third-party resolves the
HVAC issues on the Fargo Transport Path restoring the connection between Lumens
Bismarck switch and North Dakotas NG911 network.
At approximately 4:38 PM CST Lumen learns about the HVAC issues that shut down
the Fargo Transport Path.
At approximately 4:53 PM CST Lumen learns about the fiber cut that shut down the
Chicago Transport Path.
28. Approximately 155,792 users were affected by this 911 outage.71 Because Lumen is the
statewide NG911 service provider for North Dakota and Lumen required other OSPs to route their
customers 911 calls to Lumens Bismarck switch, these customers came from many different originating
service providers, including Lumen itself.72 Calls came from wireline, wireless, and Voice over Internet
Protocol (VoIP) phones.73 In all, a total of 413 calls to 911 failed to complete as a result of these events,74
and 49 of these appear to have been test calls made by a carrier.75 Therefore, 364 consumer calls to 911
in North Dakota did not reach a PSAP because of the Lumen network failure.
71 Id. at 6.
72 Id. at 7.
73 Id., Ex. 73-1.
74 Id. at 3.
75 Id., Ex. 73-1.
9
Federal Communications Commission FCC 23-81
29. Lumen automatically sent two PSAP notifications at 9:07 AM CST because it had
designed its network to send PSAP notifications when an affected PSAP was directly served by the
Lumen office experiencing an SS7 outage, rather than PSAPs indirectly affected because the Bismarck
switch was an ingress point for 911 calls.76 Lumen sent outage notifications to three PSAPs between
approximately 9:32 and 9:53 AM CST {[
]}.77 At the time of the Second 911 Outage, Lumen {[
]}.78 At
{[ ]} Lumen determined that additional PSAPs were impacted. Lumen sent outage
notifications to these six PSAPs between approximately 12:21 and 12:30 PM CST.79 Following the
outage, Lumen modified its network so that it would send automated PSAP notifications not only to
PSAPs directly served by an affected office but also to PSAPs {[
]}.80
30. Subsequent to the Second 911 Outage, Lumen provided the Bureau with conflicting
information regarding the outage causes. On March 9, 2022, Lumen reported the outage in accordance
with the provision of a 2019 consent decree requiring it to report material non-compliance with the
Commissions 911 rules.81 That report stated in relevant part: At approximately 8:15 AM (CST) on
February 22, 2022, a fiber cut occurred on [an] OC192 on the path to Chicago. This failure caused the
remaining SS7 link serving the Bismarck and Mandan offices to fail by approximately 9:00 AM (CST).82
The report did not indicate that there were any other factors leading to the failure of that SS7 link.
However, seven months later in its LOI response, Lumen indicated that it then believed the failure of the
Fargo Transport Path at 9:00 AM CST was due to HVAC issues, in combination with the cut to the
Chicago Transport Path, and likely both were necessary initial causes of that SS7 link failure.83 Then, in
its FLOI response, some ten months after the outage occurred, Lumen stated that the first fiber cut on the
Chicago Transport Path actually occurred near Henderson, Colorado, that this actually occurred the
previous day (February 21, 2022) at 12:18 PM CST some 18 hours before Lumen previously stated the
initial cut occurred,84 and that the cut to that path in the Chicago area was actually the second cut and did
not occur until 11:17 AM CST on February 22, 2022.85
C. Lumens Prior 911 Outage-Related Consent Decrees
31. Since 2015, Lumen has entered into four consent decrees with the Bureau to settle
investigations into Lumens potential violations of one or both of the same two 911-related rules (sections
76 FLOI Response, supra note 23, at 14, 15; October 7 LOI Response, supra note 17, Ex. 88-1.
77 Id., Ex. 88-1; FLOI Response, supra note 23, at 14. (The exact times of these PSAP notifications were {[
]}).
78 Id. at 15.
79 October 7 LOI Response, supra note 17, Ex. 88-1; FLOI Response, supra note 23, at 14. (Five of these PSAP
notifications were sent at {[ ]} and the sixth was sent at {[ ]}.
80 FLOI Response, supra note 23, at 15.
81 CenturyLink, Inc., Order and Consent Decree, 34 FCC Rcd 10257, 10260-10263, Consent Decree para. 14 (EB
2019) (CenturyLink 2019 Consent Decree) (Consent Decree: 911 Rules means sections 4.9 and 9.4 of the
Rules and other Communications Laws governing provision of NG911 services.) Id. at 10259.
82 March 9 Non-compliance Report, supra note 57, at 4.
83 October 7 LOI Response, supra note 17, at 2, 10.
84 FLOI Response, supra note 23, at 9.
85 Id. at 10.
10
Federal Communications Commission FCC 23-81
4.9 and 9.4) it has apparently violated in regard to the First 911 and Second 911 Outages.86 Lumen
admitted it did not timely notify PSAPs in a 2015 Consent Decree, and collectively paid over $20 million
to settle the four investigations into the Companys compliance with sections 4.9 and 9.4 (and their
predecessors) of the Commissions rules involving several outages impacting 911 service.
III. DISCUSSION
32. We find that Lumen apparently willfully and repeatedly violated sections 4.9 and 9.4 of
the Commissions rules by failing to provide potentially affected PSAPs with timely notice of the First
911 Outage and Second 911 Outage and by deploying a system that was insufficient to transmit 911 calls
reliably to PSAPs during the Second 911 Outage leading to multiple 911 call failures.87
A. Lumen Apparently Violated Section 4.9(f) of the Commissions Rules for Both
Outages
33. During both the First 911 Outage and the Second 911 Outage, Lumen failed to notify
affected PSAPs in a timely manner in apparent violation of section 4.9(f) of the Commissions rules.
Lumen was a wireline communications provider pursuant to section 4.9(f) of the Commissions rules in
both outages.88 Pursuant to section 4.9(f), a wireline communications provider that experiences a network
outage of at least 30 minutes in duration, potentially affecting at least 900,000 user-minutes, and that
potentially affects a PSAP, must notify as soon as possible the designated official at the PSAP of the
outage.89 Such notification must convey to the PSAP all available information that may be useful to the
management of the affected facility in mitigating the effects of the outage on efforts to communicate with
that facility.90
34. In the First 911 Outage, Lumens systems designed to enable the company to meet this
requirement unreasonably failed at multiple points. First, the process that should have automatically
populated the notification ticket with relevant information failed to work for reasons Lumen has not been
able to determine. As a result, no automatic notifications to the two affected PSAPs were sent. Second,
Lumens first-line backup process of a Lumen employee manually interpreting data and responding
specifically,{[
86 CenturyLink, Inc., Order and Consent Decree, 30 FCC Rcd 2848, 2852, 2856 (EB 2015) (CenturyLink 2015
Consent Decree); CenturyLink 2019 Consent Decree, supra note 81, at 10260-61, Consent Decree para. 3 (EB 2019)
(The Bureau has interpreted this rule to ensure seamless, ubiquitous, and reliable 911 service nationwide, requiring
all telecommunications carriers to implement a 911 system with the fundamental capacity to transmit all 911 calls to
a PSAP, including the capability to prevent, detect, and quickly resolve outages.); CenturyLink, Inc., Order and
Consent Decree, 35 FCC Rcd 14532 (EB 2020) (CenturyLink 2020 Consent Decree); CenturyLink, Inc., nka Lumen
Technologies, Inc., Order and Consent Decree, 36 FCC Rcd 17113, 17113, Adopting Order para. 1 (EB 2021)
(CenturyLink 2021 Consent Decree).
87 Section 312(f)(1) of the Act defines willful as the conscious and deliberate commission or omission of [any] act,
irrespective of any intent to violate the law. 47 U.S.C. 312(f)(1). The legislative history to section 312(f)(1) of
the Act clarifies that this definition of willful applies to both section 312 and 503(b) of the Act, See H.R. Rep. No.
97-765, at 51 (1982) (Conf. Rep.). The Commission has so interpreted the term in the section 503(b) context. See
Southern California Broadcasting Co., Memorandum Opinion and Order, 6 FCC Rcd 4387, 4388, para. 5 (1991)
(Southern California), recon. denied, 7 FCC Rcd 3454 (1992). Section 312(f)(2) of the Act provides that [t]he
term repeated, when used with reference to the commission or omission of any act, means the commission or
omission of such act more than once or, if such commission or omission is continuous, for more than one day. 47
U.S.C. 312(f)(2).
88 See September 2 LOI Response supra note 17, at 5; October 7 LOI Response, supra note 17, at 5.
89 47 CFR 4.9(f)(4) (requiring notification when an outage [p]otentially affects a 911 special facility); id.
4.5(e) (providing that [a]n outage that potentially affects a 911 special facility occurs whenever, inter alia, there
is a loss of communications to a PSAP potentially affecting at least 900,000 user-minutes and the outage lasts 30
minutes or more).
90 Id. 4.9(f)(4).
11
Federal Communications Commission FCC 23-81
]}also failed, {[
]}. Thus, this process failed to result in the generation of
PSAP notifications. And, finally, Lumens second-line backup for such a failurehaving {[
]}also failed due to {[
]}.91 As a result
of these errors, Lumen did not notify the two affected PSAPs for multiple days(five)after the First
911 Outage had ended.92 This is well after section 4.9(f)s requirement to notify these PSAPs as soon as
possible. We thus find Lumen apparently willfully and repeatedly violated section 4.9(f) of the
Commissions rules for the First 911 Outage by failing to notify two potentially affected PSAPs as soon
as possible.
35. During the Second 911 Outage, Lumen timely notified two PSAPs but failed to notify
nine PSAPs as soon as possible when compared to the earlier automated notifications. This outage
began at 9:00 AM CST; and by 9:07 AM CST, Lumens network had automatically notified two
potentially affected PSAPs because it had designed its network to automatically notify PSAPs directly
served by one of its switch offices. The Lumen notification system thus functioned as it should have for
these two PSAPs, and Lumen made these required notifications as soon as possible. However, Lumen
did not notify the other nine affected PSAPs as soon as possible. Although it was reasonably
foreseeable at the time that an SS7 failure at the Bismarck switch would affect PSAPs{[
]}, not just PSAPs directly served by one of its switch offices, and Lumen had
the technical capability to design its system to notify such PSAPs automatically, it had not done so.93
Only after three such PSAPs {[ ]} did Lumen send the required notifications to
those PSAPs between 9:32 AM CST and 9:53 AM CST. Moreover, almost two hours after the second
batch of notifications, and more than three hours after the first PSAPs were notified, Lumen manually
identified additional similarly affected PSAPs and sent the six related notifications between 12:22 PM
CST and 12:48 PM CST.
36. Lumen and other regulated companies have long been on notice that section 4.9 of the
Commissions rules requires them to ensure timely identification and notification of all potentially
affected PSAPs during 911 outages.94 Indeed, in 2015, a predecessor-in-interest to Lumen admitted that
its failure to notify PSAPs of a 911 outage in a timely manner violated this rule.95 Because the PSAP
notification system problem was reasonably foreseeable, and Lumen had the means to design that system
91 September 2 LOI Response, supra note 17, at 16.
92 Id. at 3.
93 FLOI Response, supra note 23, at 15.
94 See, e.g., CenturyLink 2015 Consent Decree, supra note 86, at 2848, Adopting Order para. 1 (To settle this
matter, CenturyLink will implement a far-reaching compliance plan to develop and implement proactive risk
management principles designed to plan for and provide expeditious notification to PSAPs affected by 911
outages.); CenturyLink 2021 Consent Decree CenturyLink, supra note 86, at 17113, Consent Decree para. 17
(CenturyLink shall [a]ssess its existing PSAP notification system . . . and implement . . . a plan for a PSAP
notification system updates sufficient to timely notify affected PSAPs of NG911 outages . . .); see also, e.g., T-
Mobile USA, Inc., Order and Consent Decree, 30 FCC Rcd 7247, Adopting Order para. 3 (EB 2015) (T-Mobile 2015
Consent Decree) (To settle this matter, T-Mobile will . . . implement a compliance plan to adopt proactive risk
management principles designed to . . . provide timely notification to PSAPs affected by 911 outages.); AT&T
Mobility, Inc., Order and Consent Decree, 33 FCC Rcd 6142, Adopting Order para. 3 (EB 2018) (AT&T Mobility
2018 Consent Decree) (To settle this matter, AT&T Mobility will . . . implement a compliance plan to adopt
proactive risk management principles designed to . . . enable the provision of timely 911 outage notification to
PSAPs.); T-Mobile USA, Inc., Order and Consent Decree, 36 FCC Rcd 16178, Adopting Order para. 1 (EB 2021)
(T-Mobile 2021 Consent Decree) (These rules require wireless providers to reasonably design and operate their
networks to . . . timely notify potentially affected PSAPs of reportable 911 outages.).
95 See CenturyLink 2015 Consent Decree, supra note 86, at 2852, Consent Decree para. 9.
12
Federal Communications Commission FCC 23-81
to identify and notify in a timely manner all of the potentially affected PSAPs without the need for
additional research that delayed notifications to affected PSAPs, it has no excuse for not doing so.96 That
it did not do so indicates that nine of the eleven PSAP notifications were not sent to nine potentially
affected PSAPs as soon as possible and constitutes apparent willful and repeated violations of section
4.9(f) of the Commissions rules.
B. Lumen Apparently Violated Section 9.4 of the Commissions Rules for the Second
911 Outage
37. Lumen implemented a 911 transmission system in North Dakota that was inadequate to
meet its obligations under section 9.4 of the Commissions rules in connection with the Second 911
Outage. Specifically, Lumen failed to include sufficient, reasonably available safeguards in its network to
reliably avoid, warn of, or timely resolve a significant outage of its 911 service. We therefore find that
Lumen apparently willfully and repeatedly violated section 9.4.
38. Section 9.4 of the Commissions rules requires telecommunications carriers to transmit
all 911 calls to a PSAP or other appropriate entity.97 Lumen was a telecommunications carrier in North
Dakota at the time of the outage.98 In promulgating section 9.4, the Commission required
telecommunications carriers to develop and implement the necessary translation and routing to ensure
that all 911 calls are able to reach PSAPs.99 The Commissions 911 rules anticipate that some disruptions
in service may be unavoidable despite providers best efforts to mitigate risks of failure. Therefore, we do
not suggest that any failure whatsoever in a 911 network would violate section 9.4. The Commission and
Bureau have, however, indicated that 911 networks must meet minimum standards of technical and
operational readiness to comply with applicable service requirements.100 Thus where, as here, a 911
96 Well-established Commission precedent holds that regulatees must make reasonable efforts to fulfill their
regulatory duties. Southern California, 6 FCC Rcd 4387, para 3 (actions taken by violator were not good faith
efforts to comply with the Act, in light of prior Commission actions); Rural Call Completion, Second Report and
Order and Third Further Notice of Proposed Rulemaking, 33 FCC Rcd 4199, 4219, 4211, para. 25 (2018) (Rural
Call Completion) (provider must use commercially reasonable efforts to fulfill Act section 201 responsibilities);
see also Twenty-One Sound Communications, Inc., Forfeiture Order, 20 FCC Rcd 12497, 12499, para. 8 (EB 2005),
petition for reconsideration denied, Memorandum Opinion and Order, 20 FCC Rcd 18064 (B 2005), application for
review denied, Order on Review, 23 FCC Rcd 2436 (2008) (station owner should have made reasonable efforts to
maintain Emergency Alert System Equipment in operational readiness condition); National Television Company,
Memorandum Opinion and Order, 18 FCC Rcd 19219, 19221, para. 7 (WTB 2003) (obligation to make reasonable
efforts to return a station to operational status); Leaco Rural Telephone Cooperative, Inc., and Pine Belt Cellular,
Inc., Order, 31 FCC Rcd 9001, 9006, para. 17 (WTB 2016) (licensees must make reasonable plans and efforts to
timely fulfill their Mobility Fund obligations).
97 See 47 CFR 9.4 (All telecommunications carriers shall transmit all 911 calls to a PSAP, to a designated
statewide default answering point, or to an appropriate local emergency authority as set forth in 9.5.).
98 October 7 LOI Response, supra note 17, at 5.
99 47 CFR 9.5.
100 Lumen has entered into multiple consent decrees with the Bureau to settle investigations into whether it
reasonably complied with section 9.4 and its predecessors. See CenturyLink 2015 Consent Decree, supra note 86, at
2848, Adopting Order para. 1 (To settle this matter, CenturyLink will implement a far-reaching compliance plan to
develop and implement proactive risk management principles designed to reduce the likelihood and impact of 911
failures [and] ensure reliable 911 call completion . . .); CenturyLink 2019 Consent Decree, supra note 81 at 10260,
Consent Decree para. 3 (Section 64.3001 of the Rules states that [a]ll telecommunications carriers shall transmit
all 911 calls to a PSAP, to a designated statewide default answering point, or to an appropriate local emergency
authority as set forth in 64.3002.[footnote omitted] The Bureau has interpreted this rule to ensure seamless,
ubiquitous, and reliable 911 service nationwide, requiring all telecommunications carriers to implement a 911
system with the fundamental capacity to transmit all 911 calls to a PSAP, including the capability to prevent, detect,
and quickly resolve outages.); CenturyLink 2020 Consent Decree, supra note 86, at 14532, Adopting Order para. 1
(The Commissions Enforcement Bureau has entered into a Consent Decree to resolve its investigation into
(continued.)
13
Federal Communications Commission FCC 23-81
network is not reasonably designed and operated to detect and eliminate network problems in order to
reliably transmit all 911 calls to PSAPs under reasonably foreseeable conditions, it cannot satisfy the
minimum requirements of section 9.4 of the Commissions rules.
39. Classic Sunny Day outage. The Second 911 Outage did not result from an
extraordinary natural disaster or other unforeseeable catastrophe; rather, it was a prototypical sunny day
failure that was caused by two separate failures on the part of Lumen that show the apparent failure to
comply with section 9.4. First, Lumen unreasonably failed to reconnect the first STP link for the
Bismarck switch for two days after Lumens technician disconnected it for testing, eliminating the
redundancy in Lumens network and thereby ensuring a 911 outage would occur should the second STP
link at that switch fail. This failure to reconnect the link should not have occurred, at least not for this
duration, and only did so because of the lack of proper supervision, training, and technical elements, all of
which were within Lumens control. Had Lumen adequately trained its own technician to reconnect the
disconnected STP link, had in place monitoring to warn it that a redundant SS7 link had not been
reactivated, or had a more robust technical solution to prevent technicians from failing to reconnect SS7
links after testing, the SS7 portion of the Second 911 outage would likely have been prevented.
40. Second, the Commission has consistently refused to excuse licensees from forfeiture
penalties where actions of employees or independent contractors result in violations.101 And, Lumen has
repeatedly acknowledged this responsibility in earlier 911 outage-related consent decrees with the
Bureau.102 Lumen relied on its transport contractor both to transmit vital SS7 data and to connect its
whether CenturyLink, Inc. violated the Commissions rules in connection with a multistate outage on one of
CenturyLinks transport networks that . . . affected CenturyLinks delivery of some 911 calls. These rules [sections
9.4 and 9.5 of the Commissions rules] ensure that telecommunications carriers take reasonable measures to ensure
the transmission of the publics 911 calls to emergency call centers.); CenturyLink 2021 Consent Decree, supra
note 86, at 17113, Adopting Order para. 1 (The Enforcement Bureau . . . has entered into a Consent Decree to
resolve its investigation into whether CenturyLink . . . now known as Lumen Technologies, Inc., failed to
deliver 911 calls . . . Congress has made emergency communication services a national priority, and the
Commission has repeatedly emphasized that robust and reliable 911 service must be available nationwide. It is
therefore incumbent upon the Commission to ensure that telecommunications carriers provide reliable 911 service at
all times.).
Consent decrees with other providers have also resolved investigations into whether 911 network design and
operation reasonably ensured transmission of 911 calls under these rules. See, e.g., T-Mobile 2015 Consent Decree,
supra note 94, at 7247, Adopting Order para. 3 (To settle this matter, T-Mobile will . . . implement a compliance
plan to adopt proactive risk management principles designed to reduce the likelihood and impact of 911 failures
[and] ensure reliable 911 call completion.); AT&T Mobility 2018 Consent Decree, supra note 94, at 6142,
Adopting Order para. 3 (To settle this matter, AT&T Mobility will . . . implement a compliance plan to adopt
proactive risk management principles designed to reduce the likelihood and impact of future 911 outages [and]
ensure reliable 911 call completion . . . .); T-Mobile 2021 Consent Decree, supra note 94, at 16178, Adopting
Order para. 1 (These rules [sections 9.4 and 9.10 of the Commissions rules] require wireless providers to
reasonably design and operate their networks to ensure reliable transmission of all 911 calls . . . .).
The foregoing obligation is also in line with similar obligations the Commission has imposed on
telecommunications carriers in other call-completion contexts. See e.g., Rural Call Completion, 33 FCC Rcd at
4219, para. 42 (We do not impose strict liability on covered providers for a call completion failure; rather, we may
impose a penalty where a covered provider fails to take actions to prevent reasonably foreseeable problems or, if it
knows or should know that a problem has arisen, where it fails to investigate or take appropriate remedial action.).
Finally, it accords with the well-established principle that Commission regulatees must make reasonable efforts to
fulfill their regulatory duties.
101 Triad Broadcasting Company, Inc., Memorandum Opinion and Order, 96 FCC 2d 1235, 1244, para. 21 (1984);
see also para. 8, supra. (explaining that common carriers are responsible for the acts and omissions of those
contractors or agents performing duties on their behalf).
102 CenturyLink 2021 Consent Decree, supra note 86, at 17117-18, Consent Decree paras. 4-7) (CenturyLink
acknowledges that it is responsible for complying with applicable Commission rules regardless of any alleged
(continued.)
14
Federal Communications Commission FCC 23-81
Bismarck switch to the North Dakotas NG911 Gateway. Had Lumen ensured that its transport contractor
timely notified Lumen of outages in those transmission capabilities and taken action when the fiber was
cut on the Chicago path and/or when the HVAC system experienced problems, the outage also would
likely not have occurred, or, at the least, its effects would have been substantially minimized. The
Companys failure to monitor adequately the fiber optic lines on which both the SS7 link and the
connection between the Bismarck switch and North Dakotas NG911 network gateway relied created an
avoidable point of failure.
41. As discussed below, Lumen failed to employ reasonable steps in designing and operating
key aspects of its network as evidenced by not applying both critical industry best practices and basic
good judgment, leading to the Second 911 Outage. Actions contrary to best practices are not rule
violations; however, best practices are evidence of reasonable steps to ensure reliable 911 service.103 In
turn, the failure to follow a best practice is evidence of the lack of reasonable steps to ensure reliable 911
service. In 2013, the Commission noted that because of the collaborative and consensus-based nature of
this process, CSRICs best practices generally involve aspects of service that providers have indicated
they were already adopting consistently.104 Moreover, as noted below, all of the best practices we
reference were last revised between 2013 and 2019well before the February 22 Outage.105 Further, a
Lumen representative was involved in the drafting of the majority of these best practices.106 Finally, the
Bureau has incorporated various best practices into consent decrees related to 911 outages.107
Accordingly, for all of these reasons, Lumen should reasonably have been aware of, and incorporated, all
of these best practices into its networks.
42. Insufficient Training. Lumen unreasonably failed to provide its technician with sufficient
training. It is a basic industry practice for network operators to provide their staff with sufficient training
to do their jobs adequately.108 However, in the Second 911 Outage, Lumen unreasonably failed to provide
sufficient training and supervision to its technician to ensure that the basic measure of reactivating a
deactivated SS7 link after testing was completed. Sufficient training would have ensured that the
technician double-checked to ensure the deactivated SS7 link had been reactivated after testing; it may
have included an established close-out procedure following testing that required the technician to go
through steps to ensure everything had been restored. And sufficient supervision would have provided a
backstop should the SS7 link still had not been reactivated after the technician thought the work was
complete. This unnecessary error was critical in establishing the conditions for the outage to take place.
43. Insufficient Network Monitoring. Lumen unreasonably failed to monitor its network. It
is a fundamental and well-recognized industry practice that network operators monitor their networks
failures by its subcontractors.); CenturyLink 2019 Consent Decree, supra note 81, at 10260-61, Consent Decree
paras. 4-5; CenturyLink 2015 Consent Decree, supra note 86, at 2853, Consent Decree para. 11.b.v.
103 See e.g., 911 Reliability Report and Order, supra note 5, at 17477, para. 1 (Commission views implementation of
certain industry-backed best practices as taking reasonable measures to provide reliable 911 service); FCCs
Public Safety and Homeland Security Bureau Reminds Telecommunications Service Providers of Importance of
Implementing Established 9-1-1 and Enhanced 9-1-1 Services Best Practices, Public Notice, 27 FCC Rcd 6085
(PSHSB 2012).
104 911 Reliability Report and Order, supra note 5, at 17479, para. 10.
105 See infra notes 108-112, 115-116.
106 Id.
107 See, e.g., T-Mobile 2021 Consent Decree, supra note 94, at 16178, Consent Decree para. 13(b); Intrado Safety
Communications, Inc., Order and Consent Decree, 36 FCC Rcd 17090, para. 16(b)(ii) (EB 2021).
108 See CSRIC Best Practice 13-12-8124 (Network Operators .. . should ensure staff is given awareness training on
security policies, standards, procedures, and general best practices.) (last revised 2019),
https://opendata fcc.gov/Public-Safety/CSRIC-Best-Practices/qb45-rw2t/data.
15
Federal Communications Commission FCC 23-81
sufficiently to enable a quick response to network problems.109 This applies in particular to the
monitoring of sensitive equipment and systems.110 Yet, in the Second 911 Outage, Lumen remained
unaware for several days that one of the SS7 links at its Bismarck switch had remained deactivated after
testing had been completed. These links were necessary for call set-up, routing, completion, and
management of its wireline communications; and thus, the monitoring of these links was critical.111
44. Additionally, the need for a network operator to monitor its networks reasonably extends
to those portions of its networks that it chooses to have third-parties operate.112 Indeed, the Act and
agency law make Lumen liable for the acts of its subcontractors, and Lumen has acknowledged this in
several consent decrees with the Bureau.113 However, in the Second 911 Outage, Lumen remained
unaware for more than a day that a critical fiber link necessary for SS7 connectivity and connectivity to
North Dakotas NG911 gateway had been cut. Lumen also remained unaware for many hours that the
redundant fiber link was also experiencing severe HVAC problems that impaired and even threatened
serviceability in any manner. Indeed, Lumen did not become aware of either of these problems until after
the outage had ended and the problems were resolved. Without timely knowledge of these events, which
adversely affected critical components of its network, Lumen could not take any steps to prevent them
from causing the outage, or at least potentially mitigating the effects of the outage. Moreover, because of
Lumens insufficient network monitoring, for months after the outage ended, it remained unaware of both
the actual timing and location of the cut to one of its critical fiber links and, as of the filing of the last
information with the Bureau, cannot fully explain the cause of the failure of its first SS7 link during the
Second 911 Outage.114 If not corrected, this lack of reasonable monitoring could delay or prevent Lumen
from taking appropriate remedial measures to avert similar types of 911 outages in the future.
109 CSRIC Best Practice 13-9-0401 (Network Operators . . . should monitor their network to enable quick response
to network issues.) (last revised 2013), https://opendata.fcc.gov/Public-Safety/CSRIC-Best-Practices/qb45-
rw2t/data. Lumen Representatives were both the Chair and Steering Committee Chair of the CSRIC that revised
this best practice. See Federal Commcns Commn, Communications Security, Reliability, and Interoperability
Council III, https://www.fcc.gov/about-fcc/advisory-committees/communications-security-reliability-and-
interoperability-1 (CSRIC III).
110 CSRIC Best Practice 13-10-0656 (Network Operators . . . should establish a requirement for . . . monitoring . . .
for sensitive equipment.) (last revised 2015), https://opendata fcc.gov/Public-Safety/CSRIC-Best-Practices/qb45-
rw2t/data. Lumen representatives were involved in working groups in the CSRIC that revised this best practice. See
Federal Communications Commission, CSRIC IV Working Group Descriptions and Leadership,
https://transition.fcc.gov/bureaus/pshs/advisory/csric4/CSRIC%20IV%20Working%20Group%20Descriptions%201
0%2023%2014.pdf (CSRIC IV).
111 October 7 LOI Response, supra note 17, at 1-2 (SS7 is an integral part of TDM communications and is
necessary for call set-up, routing, and completion, as well as for network management between interconnected SS7
networks.).
112 See, e.g., CSRIC Best Practice 13-9-0574 (Network Operators should actively monitor and manage the 9-1-1
network components using network management controls, where available, to quickly restore 9-1-1 service and
provide priority repair during network failure events. When multiple interconnecting providers and vendors are
involved, they will need to cooperate to provide end-to-end analysis of complex call-handling problems) (last
revised 2013). Lumen Representatives were both the Chair and Steering Committee Chair of the CSRIC that
revised this best practice. See CSRIC III; CSRIC Best Practice 13-12-0529 (Network Operators, Service Providers,
Equipment Suppliers and Public Safety should support sharing of appropriate information pertaining to outages as
an effort to decrease the potential of further propagation.) (last revised 2019), https://opendata.fcc.gov/Public-
Safety/CSRIC-Best-Practices/qb45-rw2t/data.
113 See para. 8, supra (explaining that common carriers are responsible for the acts and omissions of those
contractors or agents performing duties on their behalf); note 102, supra (Lumen has acknowledged its
responsibility for its subcontractors).
114 See paras. 23, 30, supra (discussing Lumens failure to adequately monitor its network).
16
Federal Communications Commission FCC 23-81
45. Insufficient Follow-up and Post-Mortem Procedures. Lumen unreasonably failed to
provide basic follow-up and post-mortem procedures. It is a basic industry practice for network operators
to establish the proper steps for restoration of service following maintenance activities.115 These were
insufficient in the Second 911 Outagefollowing testing, the Lumen technician simply failed to
reactivate the SS7 link at the Bismarck and Manden switches. A network operator should also have a
sufficient post-mortem process to determine the root causes of an outage and thereby take measures to
prevent a recurrence.116 However, because Lumens network monitoring was inadequate, it has to date
been unable to determine the root causes of the SS7 failure during the Second 911 Outage,117 which
means Lumen seemingly cannot take measures to prevent a similar issue from causing an outage in the
future.118
C. Proposed Forfeiture
46. Section 503(b) of the Act authorizes the Commission to impose a forfeiture against any
entity that willfully or repeatedly fail[s] to comply with any of the provisions of [the Act] or of any rule,
regulation, or order issued by the Commission[.]119 Here, section 503(b)(2)(B) of the Act authorizes us
to assess a forfeiture against a common carrier of up to $237,268 for each day of a continuing violation,
up to a statutory maximum of $2,372,677 for a single act or failure to act.120 In exercising our forfeiture
authority, we must consider the nature, circumstances, extent, and gravity of the violation and, with
respect to the violator, the degree of culpability, any history of prior offenses, ability to pay, and such
other matters as justice may require.121 In addition, the Commission has established forfeiture
guidelines, which establish base penalties for certain violations and identify criteria that we consider
when determining the appropriate penalty in any given case.122 Under these guidelines, we may adjust a
forfeiture upward for violations that are egregious, intentional, or repeated, or that cause substantial harm
or generate substantial economic gain for the violator.123
115 See, e.g., CSRIC Best Practice 13-10-0418 (Network Operators should where appropriate, have a
documented back-out plan as part of a Method of Procedure (MOP) for scheduled and unscheduled maintenance
activities.) (last revised 2015), https://opendata.fcc.gov/Public-Safety/CSRIC-Best-Practices/qb45-rw2t/data.
Lumen representatives were involved in working groups in the CSRIC that revised this best practice. See CSRIC IV,
supra.
116 CSRIC Best Practice 13-10-0548 (Network Operators should have an internal post mortem process, which
engages . . . other involved parties as appropriate, to complete root cause analysis of major network events with
follow-up implementation of corrective and preventive actions to minimize the probability of recurrence.) (last
revised 2015). Lumen representatives were involved in working groups in the CSRIC that revised this best practice.
See CSRIC IV, supra. CSRIC Best Practice 13-12-0616 (Network Operators . . . should design and implement
procedures to evaluate failure and emergency conditions affecting network capacity.) (last revised 2019), both
available at https://opendata fcc.gov/Public-Safety/CSRIC-Best-Practices/qb45-rw2t/data.
117 See paras. 23, 30, supra (discussing Lumens failure to adequately monitor its network).
118 We also note here that the First 911 Outage was avoidable had Lumen taken action to investigate and fix the
failure of the first SS7 link in the 24-hour time period before the second SS7 link failed. Additionally, it apparently
took Lumen five hours to determine the switch cards had failed, a time period that could have been lessened had the
switch cards been alarmed. However, Lumen reports no 911 calls failed during the First 911 Outage, so we find no
apparent violation of section 9.4 of the Commissions rules in that outage.
119 47 U.S.C. 503(b).
120 See 47 U.S.C. 503(b)(B); 47 CFR 1.80(b)(2); see Amendment of Section 1.80(b) of the Commissions Rules,
Adjustment of Civil Monetary Penalties to Reflect Inflation, Order, DA 22-1356, 2022 WL 18023008 (EB Dec. 23,
2022).
121 47 U.S.C. 503(b)(2)(E).
122 47 CFR 1.80(b)(11), Note 2 to paragraph (b)(11).
123 Id.
17
Federal Communications Commission FCC 23-81
1. Forfeiture Assessment on a Per Call (Section 9.4 Apparent Violations) and
Per PSAP Basis (Section 4.9 Apparent Violations)
47. To assess an appropriate forfeiture for Lumens violations, we must establish a base
forfeiture methodology for violations of sections 4.9 and 9.4 of the Commissions rules. Neither the
Commissions forfeiture guidelines nor our case law does this. In these circumstances, the Commission
has substantial discretion in proposing forfeitures and may establish new forfeitures.124 The Commission
retains its discretion to issue forfeitures on a case-by-case basis.125 To establish a base forfeiture for
violations of sections 4.9 and 9.4, we look to the base forfeitures established or issued in other cases for
guidance.
48. Because section 9.4 requires carriers to transmit all 911 calls to PSAPs and the harm from
a failure to transmit 911 calls to PSAPs accrues for each failed 911 call, we will assess a proposed
forfeiture for section 9.4 violations on a per-failed 911 call basis. We then look to other forfeiture
methodologies applied on a per-call basis to determine the appropriate value per-failed 911 call.126 First,
we note that, while impossible to precisely quantify, the monetary value of a single failed 911 call can be
immense, and that violations of rules related to 911 have long been considered extremely serious because
of the critical function these requirements serve in promoting and safeguarding life and property.127 The
American public relies on 911 calls in a time of crisis to reach first responders. We thus look to other
significant enforcement areas for guidance where the harm is based on individual calls. In the context of
spoofed robocalls, the Commission has determined a $1,000 base forfeiture per unlawful spoofed robocall
in mass-spoofing enforcement actions is appropriate.128 Because the requirement to transmit 911 calls is
124 Syntax-Brillian Corporation, Notice of Apparent Liability for Forfeiture, 22 FCC Rcd 10530, 10535, para. 12
(2007), affd Forfeiture Order and Notice of Apparent Liability for Forfeiture, 23 FCC Rcd 6323 (2008) (Syntax
Brillian); The Commission's Forfeiture Policy Statement and Amendment of section 1.80 of the Rules to Incorporate
the Forfeiture Guidelines, Report and Order, 12 FCC Rcd 17087, 17099, para. 22 (1997) (Forfeiture Policy
Statement), recons. denied, Memorandum Opinion and Order, 15 FCC Rcd 303 (1999) (The Commission has found
that the omission of a specific rule violation from the list [establishing base forfeiture amounts] should not signal
that the Commission considers any unlisted violation as nonexistent or unimportant. The Commission expects, and
it is each licensees obligation, to know and comply with all of Commissions rules.).
125 Id. [T]he breadth of agency discretion is, if anything, at zenith when the action assailed relates primarily not to
the issue of ascertaining whether conduct violates the statute, or regulations, but rather to the fashioning of ...
remedies and sanctions. American Telephone and Telegraph Co. v. FCC, 454 F.3d 329, 334 (D.C. Cir. 2006)
(quoting Niagara Mohawk Power Corp. v. FPC, 379 F.2d 153, 159 (D.C. Cir. 1967)).
126 See, e.g., John C. Spiller, Notice of Apparent Liability for Forfeiture, 35 FCC Rcd 5948, 5963-64, paras. 38-39
(2020) (proposing a forfeiture for each spoofed call) (Spiller), forfeiture ordered, 36 FCC Rcd 6225 (2021).
127 See Dobson Cellular Sys., Inc. and Am. Cellular Corp., Notice of Apparent Liability for Forfeiture, 21 FCC Rcd
4684, 4707, para. 59 (2006) (Violations of E911 requirements are extremely serious, given the critical function
these requirements serve in promoting and safeguarding life and property.) (Dobson Cellular), consent decree
ordered, Order and Consent Decree, 22 FCC Rcd 7968 (2007); see also Cardinal Broadband LLC, 23 FCC Rcd
12224, 12230, para. 16 (EB 2008); Sprint Nextel Corp., Notice of Apparent Liability for Forfeiture, 22 FCC Rcd
16414, 16418, para. 10 (2007); T-Mobile USA, Inc., Notice of Apparent Liability for Forfeiture, 18 FCC Rcd 3501,
3504, para. 7 (2003) (forfeiture paid); Alltel Corp., Notice of Apparent Liability for Forfeiture, 22 FCC Rcd 16432,
16435, para. 10 (2007) (forfeiture paid); 47 U.S.C. 503(b)(2)(E); Forfeiture Policy Statement, 12 FCC Rcd at
1710001, para. 27; 47 CFR 1.80(b)(8), Note to paragraph (b)(8).
128 See, e.g., Spiller, 35 FCC Rcd at 5963-64, paras. 38-39 (proposing a base forfeiture of $1,000 to each spoofed
call); Kenneth Moser dba Marketing Support Systems, Notice of Apparent Liability for Forfeiture, 34 FCC Rcd
12753, 12764, para. 31 (2019) (same), forfeiture ordered, 35 FCC Rcd 13415 (2020); Adrian Abramovich, Notice of
Apparent Liability for Forfeiture, 32 FCC Rcd 5418, 5426, para. 25 (2017) (same), forfeiture ordered, 33 FCC Rcd
4663 (2018) (Abramovich). Spoofing a phone call is causing a caller identification service to knowingly transmit
misleading or inaccurate caller identification information. See Call Blocking Tools Available to Consumers: Second
Report on Call Blocking, 36 FCC Rcd 10122, 10128 para. 14 (CGB 2022).
(continued.)
18
Federal Communications Commission FCC 23-81
at least as important as enforcing regulations regarding spoofed robocalls, and the potential harm from a
failed 911 call is potentially much more grievous, we conservatively also apply a $1,000 base forfeiture to
each failed 911 call. However, we note that if we determine that $1,000 per call does not appear to be a
strong enough deterrent for carriers to comply with the Commissions 911 rules, we may in future cases
assess a larger per call amount.129
49. For apparent violations of section 4.9 of the Commissions rules, we apply a per-affected
PSAP formula. As with our approach for violations of section 9.4, for violations of section 4.9, we
propose a forfeiture approach that tracks the language of the rule and the harm caused by a violation. For
failures to notify a PSAP, the harm accrues most directly to each PSAP not timely notified of the 911
outage. Section 4.9 of the Commissions rules requires various providers to notify PSAPs of outages that
affect 911 service, and without timely notice of outages, PSAPs are not able to react to and mitigate the
outage.130 We will apply a base forfeiture for each PSAP that a provider fails to notify in a timely manner
on a sliding scale basis: $10,000 per PSAP for the first 500 PSAPs, $5,000 per PSAP for the next 500
PSAPs, and $1,000 per PSAPs for each additional PSAP.
50. With regard to the base forfeiture amount, precedent related to violations of another
obligation in section 4.9 provides useful guidance here. In addition to the obligation to notify PSAPs,
section 4.9(f) also requires wireline communications providers that experience an outage to file
notifications with the Commission within 120 minutes, 72 hours, and 30 days of discovering a reportable
outage.131 The Bureau has previously determined that a base forfeiture of $40,000 is appropriate for the
failure to file the first outage notification timely with the Commission, because the notification provides a
critical public safety function in immediately alerting the Commission to potential widespread network
See also, e.g., Call Authentication Trust Anchor, WC Docket No. 17-97, Sixth Report and Order and Further Notice
of Proposed Rulemaking, FCC 23-18, 2023 WL 2582652, at *19, para. 54 (rel. Mar. 17, 2023) (establishing
forfeiture penalty on a per-call basis for violations of Commissions robocall blocking rules); Implementation of the
Middle Class Tax Relief and Job Creation Act of 2012, Establishment of a Public Safety Answering Point Do-Not-
Call Registry, CG Docket No. 12-129, Report and Order, 27 FCC Rcd 13615, 13629-30, para. 30 (2012)
(establishing monetary penalties that are not less than $10,000 per call for automatic dialing of numbers on PSAP
do-not-call registry).
129 See Syntax Brillian, 22 FCC Rcd at 10536, para. 15 (noting that the Commission may in the future depart from
the methodology applied there if it does not have adequate deterrent effect or if other circumstances require); see
also T-Mobile USA, Inc., a subsidiary of T-Mobile USA, Forfeiture Order, 29 FCC Rcd 10752, 10757 para. 14
(2014) ([T]he agencyon both the Commission and Bureau levels has repeatedly stated that it retains the
discretion to depart from existing guidelines and issue forfeitures on a case-by-case basis, pursuant to its general
forfeiture authority contained in section 503 of the Act.).
130 See 47 CFR 4.9(f).
131 47 CFR 4.9(f)(4). Other subsections of section 4.9 also require Commission notifications for entities like
wireless service providers.
19
Federal Communications Commission FCC 23-81
problems.132 The base forfeiture is $20,000 for failing to submit the second and third notifications.133
Given that the rule specifically links notification to the Commission and notification to designated PSAP
officials, and given the similar public safety reasons that an entity should notify a PSAP of an outage
affecting its facilities so that the PSAP can take immediate mitigating actions, the two types of
notifications are highly analogous. We note that a Commission notification violation can occur only three
times per outage while, because there are approximately 5,748 PSAPs nationwide, there could potentially
be hundreds or even thousands of PSAP notification violations in a single, large outage.134 Accordingly,
we find that the structure we adopt here, a $10,000 base forfeiture per PSAP for the first 500 violations of
section 4.9(f)(4), followed by $5,000 per PSAP for the next 500 PSAPs, and $1,000 per PSAPs for each
additional PSAP, is in fact beneficial to providers when compared to a straightforward application of
$40,000 (or $20,000) per failed PSAP notification that could be implemented.
51. Moreover, we find a descending sliding scale appropriate because it both (i) accounts for
the serious nature of the violation even in circumstances that are geographically confined to a small area
and a small number of PSAPs, and (ii) avoids automatically resulting in potentially excessive penalties
for nationwide outages. In sum, we base these tiers and per-PSAP penalties on our reasonable judgment
of the harm caused by the number of PSAPs affected which is consistent with Commission enforcement
precedent in other areas.135 However, we again note that if we determine that this sliding scale approach
we adopt today for PSAP notification violations does not appear to be a strong enough deterrent for
carriers to comply with the Commissions 911 rules, we may in future cases assess a larger per PSAP
amount.136
2. Base Forfeiture Applied
52. Applying the base forfeitures discussed above for failed 911 calls (section 9.4) and
PSAPs not timely notified of 911 outages (section 4.9(f)), we propose a total base forfeiture of $474,000.
132 See Alpheus Commcns, LP, Notice of Apparent Liability for Forfeiture, 25 FCC Rcd 8993, 8997, para. 11 (Enf.
Bur. 2010), consent decree entered, 26 FCC Rcd 11169 (EB 2011) ([F]ailure to timely file the Notification has a
more critical and significantly higher impact on public safety than does failure to timely file the Initial and Final
Communications Outage Reports. We set the base forfeiture at $40,000 per late filing for failure to timely file
Notifications and at $20,000 per late filing for failure to timely file Initial and Final Communications Outage
Reports.); see also id. at 8995, para. 6 (The Notification serves to inform the Commission that a major event has
occurred and assists the Commission in determining whether an immediate response is required (e.g., terrorist
attack or systemic failure) and whether patterns of outages are emerging (e.g., phased terrorist attacks) that warrant
further coordination or other action.) (footnote omitted). Although Alpheus was a Notice of Apparent Liability for
Forfeiture issued by the Enforcement Bureau and was resolved by a Consent Decree, we find the reasoning
convincing in terms of setting a base forfeiture amount for a violation of section 4.9 of the Commissions rules for
the reasons stated in the text.
133 Id.
134 See NENA: The 911 Association, 9-1-1 Statistics, https://www.nena.org/page/911Statistics (last visited May 12,
2023) (based on February 2021 statistics).
135 The Commission has applied a sliding scale to calculate forfeitures in other contexts, including for importing
noncompliant DTV tuners. See, e.g., Syntax-Brillian, 22 FCC Rcd at 10536, para. 15; Hanspree North America, Inc.,
23 FCC Rcd. 12902, 12907 para. 14 (EB 2008), affd Forfeiture Order, 24 FCC Rcd 3616 (EB 2009), modified
Memorandum Opinion and Order, 27 FCC Rcd 7968 (EB 2012); see, also Qwest Corp., Notice of Apparent
Liability for Forfeiture, 23 FCC Rcd 13451, 13455, para. 9 (2008) (implementing increasing sliding scale forfeiture
methodology for violations of DTV education requirements). Although the overall number of possible violations is
much lower, the sliding scale adopted by the Enforcement Bureau for Commission notification violations of section
4.9 of the Commissions rules also supports a sliding scale here. See, also, supra note 132.
136 See supra note 129; see, also, e.g., T-Mobile USA, Inc., A Subsidiary of T-Mobile US, Inc., Forfeiture Order, FCC
Rcd 10752, 10756, para. 11 (EB 2014) (revising forfeiture methodology to adequately reflect the nature and scope
of violations); Caguas Educational TV, Inc., Notice of Apparent Liability for Forfeiture, 20 FCC Rcd 6093, 6097,
para. 10 (EB 2005) (adjusting forfeiture amount to avoid excessive penalty).
20
Federal Communications Commission FCC 23-81
This is comprised of a base forfeiture of $364,000 for 364 failed 911 calls in the Second 911 Outage (364
x $1,000), a base forfeiture of $20,000 for the two untimely PSAP notifications in the First 911 Outage (2
x $10,000), and a base forfeiture of $90,000 for the nine untimely PSAP notifications in the Second 911
Outage (9 x $10,000).
3. Upward Adjustments
53. In addition, given the totality of the circumstances, and consistent with the Forfeiture
Policy Statement, we conclude that a significant upward adjustment to the base forfeiture is warranted.
First, the Commission has determined that large or highly profitable companies should expect to pay
higher forfeitures for violations of the Act and the Commissions rules.137 In 2022, Lumens gross
revenues were more than $20.7 billion.138 Thus, to ensure that the forfeiture is an effective deterrent and
not simply a cost of doing business for Lumen, a significant upward adjustment of the base forfeiture
amount is further justified. In the present case, a larger forfeiture will protect the interests of consumers
and deter entities from violating the Commissions rules.139
54. Second, we also find that an upward adjustment is warranted for egregiousness. Lumens
multi-day delay in notifying affected PSAPs of the First 911 Outage was so substantial as to constitute an
egregious violation because Lumen failed to treat PSAP notification as a priority commensurate with the
public safety nature of the matter.140
55. Finally, the Commission may also adjust a forfeiture upward where there is a history of
prior violations of FCC requirements.141 With regard to its PSAP notification violations, in a 2015
consent decree, CenturyLink, Inc.Lumens name at the timepaid a $16 million fine as part of settling
an investigation into whether it (i) timely notified potentially affected PSAPs of a 911 outage in
compliance with section 4.9(f) of the Commissions rules, which it admitted it did not, and (ii) properly
transmitted 911 calls to those PSAPs pursuant to section 64.3001 of the Commissions rules (the former
numbering of present section 9.4 of the Commissions rules).142 In that consent decree, Lumen admitted
to violating section 4.9(f) of the Commissions rule by failing to timely notify 83 PSAPs in seven
137 See Forfeiture Policy Statement, supra note 124, at 1709917100, paras. 2324 (cautioning all entities and
individuals that the Commission will take into account the violators ability to pay in determining a forfeiture to
guarantee that large or highly profitable entities do not consider forfeitures merely an affordable cost of doing
business, and noting that such entities should expect proposed forfeitures against them to be well above the
applicable base amount); see also SM Radio, Inc., Order on Review, 23 FCC Rcd 2429, 2433, para. 12 (2008)
(citations omitted); Tesla Exploration, Inc., Notice of Apparent Liability for Forfeiture, 27 FCC Rcd 9808, 9811,
para. 10 & n.20 (2012); Union Oil, 27 FCC Rcd 13806, 13810, para. 10 (2012); GCI Commcns Corp., Notice of
Apparent Liability for Forfeiture, 28 FCC Rcd 12991 (EB 2013) (doubling base forfeiture based on companys
ability to pay); Am. Movil, S.A.B. de C.V., Parent of Puerto Rico Tel. Co., Inc., Notice of Apparent Liability for
Forfeiture, 26 FCC Rcd 8672, 8676, para. 10 (EB 2011) (same).
138 See Sec. & Exch. Commn, Lumens 2022 SEC 10-K filing, https://ir.lumen.com/financials/sec-
filings/default.aspx.
139 See, e.g., Forfeiture Policy Statement, supra note 124, at 17098, para. 20 (1997) (recognizing the relevance of
creating the appropriate deterrent effect in choosing a forfeiture); see also 47 CFR 1.80(b)(11), Note 2 to
paragraph (b)(11) (identifying upward adjustment criteria for section 503 forfeitures).
140 The Commission has upwardly adjusted for egregious conduct in prior 911 cases. See, e.g., Dobson Cellular, 21
FCC Rcd at 4707, para. 59.
141 47 CFR 1.80(b)(11) at Table 3.
142 CenturyLink 2015 Consent Decree, supra note 86, at 2848.
21
Federal Communications Commission FCC 23-81
states.143 Lumen has also previously violated other Commission rules.144 These prior violations also
warrant an upward adjustment.
56. Based on the foregoing, we propose to upwardly adjust the proposed forfeiture by
$393,000 and resulting in a proposed forfeiture of $867,000.
4. Downward Adjustments
57. In applying the applicable statutory factors, we also consider whether there is any basis
for a downward adjustment of the proposed forfeiture. Here, we find none.
58. Therefore, after applying the Forfeiture Policy Statement, section 1.80 of the
Commissions rules, and the statutory factors, we propose a total forfeiture of $867,000.
IV. CONCLUSION
59. We have determined that Lumen apparently willfully and repeatedly violated sections 4.9
and 9.4 of the Commissions rules. As such, Lumen is apparently liable for a forfeiture of $867,000.
V. ORDERING CLAUSES
60. Accordingly, IT IS ORDERED that, pursuant to section 503(b) of the Act, 47 U.S.C.
503(b), and section 1.80 of the Commissions rules, 47 CFR 1.80, Lumen Technologies, Inc. is hereby
NOTIFIED of this APPARENT LIABILITY FOR A FORFEITURE in the amount of eight hundred
and sixty-seven thousand dollars ($867,000) for willful and repeated violations of sections 4.9 and 9.4 of
the Commissions rules, 47 CFR 4.9, 9.4.
61. IT IS FURTHER ORDERED that, pursuant to section 1.80 of the Commissions rules,
47 CFR 1.80, within thirty (30) calendar days of the release date of this Notice of Apparent Liability for
Forfeiture, Lumen Technologies, Inc., SHALL PAY the full amount of the proposed forfeiture or
SHALL FILE a written statement seeking reduction or cancellation of the proposed forfeiture consistent
with paragraph 64 below.
62. In order for Lumen Technologies, Inc., to pay the proposed forfeiture, Lumen
Technologies, Inc., shall notify the Spectrum Enforcement Division at EB-SED-Response@fcc.gov of its
intent to pay, whereupon an invoice will be posted in the Commissions Registration System (CORES) at
https://apps.fcc.gov/cores/userLogin.do. Upon payment, Lumen Technologies, Inc., shall send electronic
notification of payment to the Spectrum Enforcement Division, Enforcement Bureau, Federal
Communications Commission, at EB-SED-Response@fcc.gov on the date said payment is made.
Payment of the forfeiture must be made by credit card using CORES at
https://apps.fcc.gov/cores/userLogin.do, ACH (Automated Clearing House) debit from a bank account, or
by wire transfer from a bank account. The Commission no longer accepts forfeiture payments by check
or money order. Below are instructions that payors should follow based on the form of payment
selected:145
Payment by wire transfer must be made to ABA Number 021030004, receiving bank
TREAS/NYC, and Account Number 27000001. In the OBI field, enter the FRN(s) captioned
143 Id. at 2848, para. 1, 2850, para. 2(c), 2852, para. 9.
144 For example, the Commissions Consumer and Governmental Affairs Bureau has found that CenturyLink
engaged in the unauthorized change of a subscribers telecommunications carrier. See e.g., CenturyLink Complaints
Regarding Unauthorized Change of Subscribers' Telecommunications Carrier, Order, 34 FCC Rcd 2839 (CGB
2019).
145 For questions regarding payment procedures, please contact the Financial Operations Group Help Desk by phone
at 1-877-480-3201 (option #1).
22
Federal Communications Commission FCC 23-81
above and the letters FORF. In addition, a completed Form 159146 or printed CORES form147
must be faxed to the Federal Communications Commission at 202-418-2843 or e-mailed to
RROGWireFaxes@fcc.gov on the same business day the wire transfer is initiated. Failure to
provide all required information in Form 159 or CORES may result in payment not being
recognized as having been received. When completing FCC Form 159 or CORES, enter the
Account Number in block number 23A (call sign/other ID), enter the letters FORF in block
number 24A (payment type code), and enter in block number 11 the FRN(s) captioned above
(Payor FRN).148 For additional detail and wire transfer instructions, go to
https://www.fcc.gov/licensing-databases/fees/wire-transfer.
Payment by credit card must be made by using CORES at
https://apps.fcc.gov/cores/userLogin.do. To pay by credit card, log-in using the FCC Username
associated to the FRN captioned above. If payment must be split across FRNs, complete this
process for each FRN. Next, select Manage Existing FRNs | FRN Financial | Bills & Fees from
the CORES Menu, then select FRN Financial and the view/make payments option next to the
FRN. Select the Open Bills tab and find the bill number associated with the NAL Acct. No.
The bill number is the NAL Acct. No. with the first two digits excluded (e.g., NAL 1912345678
would be associated with FCC Bill Number 12345678). After selecting the bill for payment,
choose the Pay by Credit Card option. Please note that there is a $24,999.99 limit on credit
card transactions.
Payment by ACH must be made by using CORES at https://apps.fcc.gov/cores/userLogin.do. To
pay by ACH, log in using the FCC Username associated to the FRN captioned above. If payment
must be split across FRNs, complete this process for each FRN. Next, select Manage Existing
FRNs | FRN Financial | Bills & Fees on the CORES Menu, then select FRN Financial and the
view/make payments option next to the FRN. Select the Open Bills tab and find the bill number
associated with the NAL Acct. No. The bill number is the NAL Acct. No. with the first two
digits excluded (e.g., NAL 1912345678 would be associated with FCC Bill Number 12345678).
Finally, choose the Pay from Bank Account option. Please contact the appropriate financial
institution to confirm the correct Routing Number and the correct account number from which
payment will be made and verify with that financial institution that the designated account has
authorization to accept ACH transactions.
63. Any request for making full payment over time under an installment plan should be sent
to: Chief Financial OfficerFinancial Operations, Federal Communications Commission, 45 L Street,
NE, Washington, D.C. 20554.149 Questions regarding payment procedures should be directed to the
Financial Operations Group Help Desk by phone, 1-877-480-3201, or by e-mail,
ARINQUIRIES@fcc.gov.
64. The written statement seeking reduction or cancellation of the proposed forfeiture, if any,
must include a detailed factual statement supported by appropriate documentation and affidavits pursuant
to sections 1.16 and 1.80(f)(3) of the Commissions rules.150 The written statement must be mailed to the
Office of the Secretary, Federal Communications Commission, 45 L Street, NE, Washington, D.C. 20554,
ATTN: Enforcement Bureau Spectrum Enforcement Division, and must include the NAL/Account
146 FCC Form 159 is accessible at https://www fcc.gov/licensing-databases/fees/fcc-remittance-advice-form-159.
147 Information completed using the Commissions Registration System (CORES) does not require the submission
of an FCC Form 159. CORES is accessible at https://apps fcc.gov/cores/userLogin.do.
148 Instructions for completing the form may be obtained at http://www.fcc.gov/Forms/Form159/159.pdf.
149 See 47 CFR 1.1914.
150 Id. 1.16, 1.80(f)(3).
23
Federal Communications Commission FCC 23-81
Number referenced in the caption. The statement must also be e-mailed to the Spectrum Enforcement
Division at EB-SED-Response@fcc.gov.151
65. The Commission will not consider reducing or canceling a forfeiture in response to a
claim of inability to pay unless the petitioner submits the following documentation: (1) federal tax returns
for the past three years; (2) financial statements for the past three years prepared according to generally
accepted accounting practices; or (3) some other reliable and objective documentation that accurately
reflects the petitioners current financial status.152 Any claim of inability to pay must specifically identify
the basis for the claim by reference to the financial documentation. Inability to pay, however, is only one
of several factors that the Commission will consider in determining the appropriate forfeiture, and we
retain the discretion to decline reducing or canceling the forfeiture if other prongs of 47 U.S.C.
503(b)(2)(E) support that result.153
66. IT IS FURTHER ORDERED that a copy of this Notice of Apparent Liability for
Forfeiture shall be sent by first class mail and certified mail, return receipt requested, to Craig Brown,
Assistant General Counsel, Lumen Technologies, Inc., 1025 Eldorado Blvd., Broomfield, CO 80021.
FEDERAL COMMUNICATIONS COMMISSION
Marlene H. Dortch
Secretary
151 Any entity that is a Small Business Concern as defined in the Small Business Act (Pub. L. 85-536, as amended)
may avail itself of rights set forth in that Act, including rights set forth in 15 U.S.C. 657, Oversight of Regulatory
Enforcement, in addition to other rights set forth herein.
152 47 U.S.C. 503(b)(2)(E).
153 See, e.g., Ocean Adrian Hinson, Surry County, North Carolina, Forfeiture Order, 34 FCC Rcd 7619, 7621, para.
9 & n.21 (2019); Vearl Pennington and Michael Williamson, Forfeiture Order, 34 FCC Rcd 770, paras. 1821
(2019); Fabrice Polynice, Harold Sido and Veronise Sido, North Miami, Florida, Forfeiture Order, 33 FCC Rcd
6852, 686062, paras. 2125 (2018); Abramovich, 33 FCC Rcd at 4678-79, paras. 44-45; Purple Communications,
Inc., Forfeiture Order, 30 FCC Rcd 14892, 14903-904, paras. 32-33 (2015); TV Max, Inc., et al., Forfeiture Order,
29 FCC Rcd 8648, 8661, para. 25 (2014).
24