Click here for Adobe Acrobat version

******************************************************** 
                      NOTICE
********************************************************

This document was converted from a PDF version

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************



Federal Communications Commission DA 22-325


Before the
Federal Communications Commission
Washington, D.C. 20554

In the Matter of ) 
) 
Massey, Wood and West, Inc. ) File No.: EB-FIELDNER-20-00031025
and MWW Realty Corp., ) 
Antenna Structure Owners ) 
)
Mechanicsville, Virginia )

CITATION AND ORDER
ANTENNA STRUCTURE LIGHTING AND REGISTRATION

Adopted: March 28, 2022 Released: March 28, 2022

By the Regional Director, Region One, Enforcement Bureau:

I. NOTICE OF CITATION
1. This is a CITATION AND ORDER (Citation) issued to Massey, Wood and West, Inc.
and MWW Realty Corp. (together, MWW), owners of antenna structure 1020743 located in
Mechanicsville, Virginia (Antenna Structure), for failing to (a) maintain the required obstruction lighting
for an antenna structure that exceeds 60.96 meters (200 feet) in height above ground level;1 (b) observe
the required Antenna Structure lighting at least once each 24 hours visually or use an automatic indicator
or alarm system to detect a lighting outage;2 (c) notify the Federal Aviation Administration (FAA) about
lighting outages;3 and (d) notify the Federal Communications Commission (FCC or Commission) of a
change in Antenna Structure ownership information.4 We therefore direct MWW to take immediate steps
to comply with FCC antenna structure lighting and registration regulations. If MWW fails to comply
with these laws, it may be liable for significant fines. 
2. Notice of Duty to Comply with the Law: We issue this Citation pursuant to section
503(b)(5) of the Communications Act of 1934, as amended (Act), which states that the Commission may
not impose monetary forfeitures against non-regulatees who violate Commission rules or the Act unless
and until: (a) the Commission issues a citation to the violator; (b) the Commission provides the violator a
reasonable opportunity to respond; and (c) the violator subsequently engages in conduct described in the
citation.5 Accordingly, MWW is hereby on notice that it must comply with section 303(q) of the Act and
the Commissions rules promulgated thereunder, including sections 17.6(a), 17.21(a), 17.47(a), 17.48(a),
and 17.57 of the rules.6 If MWW subsequently engages in any conduct of the type this Citation describes,

1 47 CFR 17.6(a), 17.7(a), 17.21(a); see also 47 U.S.C. 303(q) (the Commission has authority to require the
painting and/or illumination of radio towers if and when in its judgment such towers constitute, or there is a
reasonable possibility that they may constitute, a menace to air navigation).
2 47 CFR 17.47(a).
3 47 CFR 17.48(a).
4 47 CFR 17.57.
5 See 47 U.S.C. 503(b)(5). Section 503(b)(5) of the Act provides that a Citation is not required in the case of
violations of section 303(q) of the Act, 47 U.S.C. 303(q), if the person or entity involved is a nonlicensee tower
owner who has previously received notice of the obligations imposed by section 303(q) from the Commission or the
permittee or licensee who uses that tower. In this case, however, we are providing a Citation to MWW, because
MWW is a nonlicensee, and such notice may not have been provided to it previously.
6 47 U.S.C. 303(q); 47 CFR 17.6(a), 17.21(a), 17.47(a), 17.48(a), 17.57.
Federal Communications Commission DA 22-325

MWW may be subject to civil penalties, including but not limited to, substantial monetary forfeitures. In
assessing such forfeitures, the Commission may consider both the conduct that led to this Citation and the
conduct following the Citation.7
3. Notice of Duty to Provide Information: Pursuant to sections 4(i), 4(j), and 403 of the
Act,8 we direct MWW to respond in writing, within thirty (30) calendar days after the release date of this
Citation, to the questions and requests for documents set out in Section IV of this Citation. 
II. BACKGROUND 
4. On May 12, 2020, the FCC Operations Center received a complaint from a consumer
reporting a tower lighting outage for antenna structure number 1020743. Finding that no Notice to Air
Missions (NOTAM) had been issued for the Antenna Structure, the FCC Operations Center asked the
FAA that same day to issue a 30-day NOTAM for the Antenna Structure.9 In response to the complaint,
an Agent from the Enforcement Bureaus Field Office in Columbia, Maryland (Columbia Office), opened
an investigation and subsequently extended the NOTAM three times for the Antenna Structure.10 On
November 23, 2020, the Agent inspected the Antenna Structure and observed that the Antenna Structure,
which was over 200 feet in height above ground level, was located at the coordinates listed in the FCC
Antenna Structure Registration (ASR) database, was painted, and had a lighting system installed. On
February 2, 2022, another Agent from the Columbia Office observed that the lights on the Antenna
Structure were not lit after sunset.11 Commission records indicate that this Antenna Structure had been
used at one time for licensed radio operations.12 Local property records indicate that Massey, Wood and

7 See S. Rep. No. 95-580, 95th Cong., 1st Sess. at 9 (1977) (If a person or entity that has been issued a citation by
the Commission thereafter engages in the conduct for which the citation of violation was sent, the subsequent notice
of apparent liability would attach not only for the conduct occurring subsequently but also for the conduct for
which the citation was originally sent.) (emphasis added).
8 47 U.S.C. 154(i), 154(j), 403.
9 NOTAMs alert aircraft pilots of potential hazards, including antenna structure lighting outages, which could affect
flight safety.
10 In addition to the FCC Agent extending the NOTAM for the Antenna Structure, in July 2021, a representative of
Edward Barnette, the former tower manager for Antenna Structure 1020743, requested a NOTAM extension
because of the lighting outage (although a NOTAM was already in place).
11 See Agent observation of Antenna Structure 1020743 (Feb. 2, 2022) (on file in EB-FIELDNER-20-00031025).
12 See WQYS810, Industrial/Business Radio Pool; KFG936, Industrial/Business Radio Pool (cancelled); WQHT829,
Industrial/Business Radio Pool (cancelled); KNRT488, Specialized Mobile Radio Service (cancelled); WNMD391,
Specialized Mobile Radio Service (cancelled); WPJY518, Specialized Mobile Radio Service (cancelled);
WNWC600, Location Wideband Radio Service (cancelled); WPIF767, Private Carrier Paging (cancelled). These
licenses are available at https://www.fcc.gov/wireless/universal-licensing-system. According to the ASR database,
antenna structure number 1020743, located at 37 37 16.0 North latitude and 77 23 43.0 West longitude, was
registered by Brook Hill Communications, Inc. (Brook Hill). See Brook Hill Communications, Inc., Application for
Antenna Structure Registration, File No. A0024759 (filed May 9, 1997, by Edward N. Barnette, president of Brook
Hill). On October 28, 2021, Edward N. Barnette submitted to the Enforcement Bureau an agreement from March
1989 (Tower Lease), between Brook Hill and the previous owner of the Antenna Structure at 8424 Meadowbridge
Road, Mechanicsville, Virginia, for Brook Hills use and management of the Antenna Structure, including
responsibility for tower maintenance and lighting. See Filing on behalf of Edward N. Barnette (Oct. 28, 2021) (on
file in EB-FIELDNER-20-00031025) (the purpose of the filing is to remove Edward Barnette, the former tower
manager from any liability for the tower). The Tower Lease, effective March 1989, was for a term of ten years,
renewable unless either party gave written notice to the other of its intent to terminate at least 180 days prior to
expiration of the term. In 1996, MWW acquired the property and the Antenna Structure, and in November 1997,
Massey, Wood and West, Inc. informed Brook Hill that the Tower Lease would not be renewed. Id. In a November
1999 letter to MWW Realty Corp., Brook Hill agreed to continue to be responsible for tower maintenance and
lighting for half of the revenue from the tenants on the Antenna Structure. In April 2011, Brook Hill informed
Massey, Wood and West, Inc. that there were no longer tenants on the Antenna Structure and that electricity would
be used for tower lights. Id. According to Edward Barnette, when Brook Hill terminated its tenant relationship in
(continued.)
2
Federal Communications Commission DA 22-325

West, Inc. and MWW Realty Corp. acquired the property and the Antenna Structure located at 8424
Meadowbridge Road, Mechanicsville, Virginia in June 1996.13
5. According to the ASR database, the Antenna Structure, which exceeds 200 feet in height
above ground,14 is required to meet certain painting and lighting specifications.15 Specifically, the
Antenna Structure must be painted and have at its top a flashing red beacon positioned so as to insure
unobstructed visibility of the beacon from aircraft at any normal angle of approach, along with steady
burning red side obstruction lights on levels at approximately two-thirds and one-third of the overall
height of the tower, mounted so as to insure unobstructed visibility of at least one light at each level from
aircraft at any normal angle of approach, and all of the lights must burn continuously or be controlled by a
light sensitive device adjusted so that the lights will be turned on and off based on the sky light intensity
levels.16
6. Even though an antenna structure is no longer being used for the transmission of radio
energy, the antenna structure owner is required to maintain the painting and lighting specifications
assigned to the structure until the structure is dismantled,17 is required to observe the antenna structure
lighting at least once each 24 hours visually or use an automatic properly maintained indicator or alarm
system to detect a lighting outage,18 is required to notify the FAA of certain lighting outages,19 and is
required to notify the Commission of any change in ownership information.20 Failing to maintain
required lighting and marking of an antenna structure and failing to notify the FAA of lighting outages
can create a risk to aviation safety. Failing to update the Commission of a change in antenna structure
ownership information exacerbates the problem by diminishing the Commissions ability to identify the
antenna structure owner when attempting to remedy lighting outages. 
III. APPLICABLE LAW AND VIOLATIONS
7. Section 303(q) of the Act states that antenna structure owners shall maintain the painting
and lighting of antenna structures as prescribed by the Commission.21 Section 17.6(a) of the

April 2011, Brook Hills responsibility for the lighting on the Antenna Structure ended. See Agent interview with
representative of Edward Barnette (Nov. 12, 2021) (on file in EB-FIELDNER-20-00031025).
13 See Virginia State, Hanover County Property Assessors Office Database, Grid Parcel Identification Number
(GPIN) 8705-21-7388; Hanover County Circuit Court Land Records, Deed Book 1203, Deed Page 337, Deed dated
June 25, 1996, filed in the Hanover County Circuit Court Clerks Office on Aug. 5, 1996 (on file in EB-FIELDNER-
20-00031025). 
14 The registration for Antenna Structure 1020743 indicates that the overall height above ground is 118.8 meters
(389.8 feet).
15 Certain existing structures have been assigned FCC Paragraphs, instead of chapters, from FAA Advisory
Circulars. The FCC Paragraphs applicable to this Antenna Structure are 1, 3, 12, and 21. The assigned FCC
Paragraphs, which outline specific painting and lighting requirements, have been printed directly on the registration
for Antenna Structure 1020743. The text of the FCC Paragraphs is available at
https://www.fcc.gov/wireless/bureau-divisions/competition-infrastructure-policy-division/antenna-painting-lighting. 
16 Id. 
17 See 47 U.S.C. 303(q); 47 CFR 17.2; see also 2004 and 2006 Biennial Regulatory Reviews - Streamlining and
Other Revisions of Parts 1 and 17 of the Commissions Rules Governing Construction, Marking and Lighting of
Antenna Structures, Report and Order, 29 FCC Rcd 9787, 9808, para. 53 (2014) (stating that a structure is
considered an antenna structure from the start of construction through dismantlement, regardless of when it begins
and ceases to transmit radio energy and emphasizing that an antenna structure owners obligations do not cease
until the structure is dismantled).
18 47 CFR 17.47(a).
19 47 CFR 17.48(a).
20 47 CFR 17.57. 
21 47 U.S.C. 303(q).
3
Federal Communications Commission DA 22-325

Commissions rules states that an antenna structure owner is responsible for complying with applicable
structure painting and lighting regulations.22 Section 17.21(a) of the rules requires that an antenna
structure for which the FAA must be notified (i.e., one that is greater than 60.96 meters (200 feet) in
height above ground level) must have painting and lighting.23 Section 17.47(a) of the rules requires that
the lighting on an antenna structure must be observed at least once every 24 hours either visually or by
using an automatic indicator or alarm system that will detect a lighting outage.24 Section 17.48(a) of the
rules requires an antenna structure owner to notify the FAA immediately of any known extinguishment or
improper functioning of any top steady burning light or any flashing obstruction light, regardless of its
position on the antenna structure, not corrected within 30 minutes.25 Under section 17.57 of the rules, the
owner of an antenna structure for which an ASR number has been obtained must notify the Commission
of any change in the antenna structures ownership information within five (5) days of such change.26
8. The record in this case demonstrates that the Antenna Structure was registered with the
Commission by Brook Hill, as a manager of the Antenna Structure,27 and that FCC licensees once
operated transmitters from the Antenna Structure.28 The record in this case also demonstrates that MWW
has not maintained the obstruction lighting for the Antenna Structure,29 and that MWW has not notified
the Commission of the change in antenna structure ownership information.30 The Commission has made
clear that antenna structure owners will have primary responsibility for maintaining the prescribed
painting and lighting on their antenna structures and will not be permitted to circumvent this
responsibility by entering into contractual arrangements.31 Based on the foregoing evidence, we find that
MWW violated section 303(q) of the Act, and sections 17.6(a), 17.21(a), 17.47(a), 17.48(a), and 17.57 of
the Commissions rules.32 
IV. REQUEST FOR INFORMATION 
9. We direct MWW to respond to the following inquiries and/or provide the requested
documents within 30 days from the release date of this Citation: 
i. Provide a copy of the agreement to convey the Antenna Structure to Massey,
Wood and West, Inc. and/or MWW Realty Corp., including the deed from 1996
conveying the property and the Antenna Structure located at 8424 Meadowbridge


22 47 CFR 17.6(a).
23 47 CFR 17.21(a); see also 47 CFR 17.7(a).
24 47 CFR 17.47(a).
25 47 CFR 17.48(a). 
26 47 CFR 17.57 (the owner must notify the Commission by filing an FCC Form 854). 
27 See supra n.12. Brook Hill provided contractual documents between itself and the Antenna Structure owner
indicating the extent of Brook Hills responsibilities regarding the Antenna Structure, including responsibilities for
maintenance and lighting. The owner of an antenna structure that requires notice of proposed construction to the
FAA due to physical obstruction must register the structure with the Commission. 47 CFR 17.4(a). MWW, as the
owner of Antenna Structure 1020743, is responsible for updating the ownership information in the ASR database. 
28 See supra para. 4, n.12.
29 See supra para. 4; 47 CFR 17.6(a), 17.21(a).
30 See supra para. 4; 47 CFR 17.57. 
31 See Streamlining the Commissions Antenna Structure Clearance Procedure and Revision of Part 17 of the
Commissions Rules Concerning Construction, Marking, and Lighting of Antenna Structures, Report and Order,
11 FCC Rcd 4272, 4294-96, paras. 52-53, 56-58 (1995); see also 47 CFR 17.2(c) (Notwithstanding any
agreements made between the owner and any entity designated by the owner to maintain the antenna structure, the
owner is ultimately responsible for compliance with the requirements of this part [17]).
32 47 U.S.C. 303(q); 47 CFR 17.6(a), 17.21(a), 17.47(a), 17.48(a), 17.57.
4
Federal Communications Commission DA 22-325

Road, Mechanicsville, Virginia, and provide a written statement describing the
circumstances surrounding acquisition of the Antenna Structure.
ii. Provide a copy of any agreements subsequent to the 1996 deed regarding
conveyance of the Antenna Structure and current Antenna Structure ownership
information.
iii. Describe the actions MWW has taken to prevent future violations of section
303(q) of the Act, and part 17 of the Commissions rules, and provide a timeline
specifying when MWW will complete any pending corrective actions. 
V. OPPORTUNITY TO RESPOND TO THIS CITATION
10. MWW must respond to this Citation within 30 calendar days from the release date of this
Citation. MWW may respond by any of the following methods: (1) a written statement, (2) a
teleconference interview, or (3) a personal interview at the Commission Field Office nearest to MWWs
place of business. The Commission Field Office nearest MWW is located in Columbia, Maryland. 
11. If MWW requests a teleconference or personal interview, contact the FCCs Columbia
Regional Office at 301-725-1996. We note that such teleconference or interview must take place within
30 calendar days of the release date of this Citation. If MWW prefers to submit a written response with
supporting documentation, it must send the response within 30 calendar days of the release date of this
Citation to the contact and address provided in the paragraph below.
12. All written communications should be sent to the street address and e-mail address below
and reference File Number EB-FIELDNER-20-00031025.
David C. Dombrowski
Enforcement Bureau
Federal Communications Commission
EB Columbia Regional Office 
9050 Junction Drive 
Annapolis, Maryland 20701 
Field@fcc.gov

13. Upon request, the Commission will make reasonable accommodations for persons with
disabilities. If applicable, MWW should provide a description of the accommodation required, and
include as much detail as possible, and also provide a telephone number and other contact information. 
MWW should allow at least five business days advance notice; last minute requests will be accepted, but
may be impossible to fill. MWW should send an e-mail to fcc504@fcc.gov or call the FCCs Consumer
and Governmental Affairs Bureau:
For sign language interpreters, CART, and other reasonable accommodations: 
202-418-0530 (voice), 202-418-0432 (tty); and

For accessible format materials (braille, large print, electronic files, and audio format): 
202-418-0531 (voice), 202-418-7365 (tty). 

14. We advise MWW that it is a violation of section 1.17 of the Commissions rules33 for any
person to make any false or misleading written or oral statement of fact to the Commission. Specifically,
no person shall:
(1) In any written or oral statement of fact, intentionally provide material factual
information that is incorrect or intentionally omit material information that is
necessary to prevent any material factual statement that is made from being
incorrect or misleading; and


33 47 CFR 1.17.
5
Federal Communications Commission DA 22-325

(2) In any written statement of fact, provide material factual information that is
incorrect or omit material information that is necessary to prevent any material
factual statement that is made from being incorrect or misleading without a
reasonable basis for believing that any such material factual statement is correct
and not misleading.
15. Further, the knowing and willful making of any false statement, or the concealment of
any material fact, in reply to this Citation is punishable by fine or imprisonment.34
16. Violations of section 1.17 of the Commissions rules or the criminal statute referenced
above may result in further legal action, including monetary forfeitures pursuant to section 503 of the Act.
17. Finally, we warn MWW that, under the Privacy Act of 1974,35 Commission staff will use
all relevant material information before it, including information disclosed in interviews or written
statements, to determine what, if any, enforcement action is required to ensure MWWs compliance with
the Act and the Commissions rules.36
VI. FUTURE VIOLATIONS
18. If, after receipt of this Citation, MWW again violates section 303(q) of the Act, and/or
sections 17.6(a), 17.21(a), 17.47(a), 17.48(a), and 17.57 of the Commissions rules by engaging in
conduct of the type described herein, the Commission may impose sanctions for each such violation. For
example, the Commission may impose monetary forfeitures. The base forfeiture for failure to comply
with prescribed lighting and/or marking is $10,000.37 The Commission may further adjust the forfeiture
reflecting enumerated statutory factors, which include the nature, circumstances, extent, and gravity of
the violation and, with respect to the violator, the degree of culpability, any history of prior offenses,
ability to pay, and such other matters as justice may require.38 
VII. ORDERING CLAUSES
19. Accordingly, IT IS ORDERED that, pursuant to sections 4(i) and 4(j) of the Act,39
Massey, Wood and West, Inc. and MWW Realty Corp. must cease and desist from future violations of the
Commissions rules for the lighting of antenna structures set forth in sections 17.6(a), 17.21(a), 17.47(a)
and 17.48(a), and must update the Antenna Structure ownership information pursuant to section 17.57 of
the Commissions rules.40 
20. IT IS FURTHER ORDERED that, pursuant to sections 4(i), 4(j), and 403 of the Act,41
Massey, Wood and West, Inc. and MWW Realty Corp. must provide the written information requested in
Section IV, above. Massey, Wood and West, Inc. and MWW Realty Corp. must support the responses
with an affidavit or declaration under penalty of perjury, signed and dated by an authorized officer of
Massey, Wood and West, Inc. and MWW Realty Corp. with personal knowledge of the representations
provided in the response, verifying the truth and accuracy of the information therein and that all of the
information requested has been produced. All such declarations provided must comply with section 1.16


34 18 U.S.C. 1001.
35 5 U.S.C. 552a(e)(3).
36 Any entity that is a Small Business Concern as defined in the Small Business Act (Pub. L. 85-536, as amended)
may avail itself of rights set forth in that Act, including rights set forth in 15 U.S.C. 657, Oversight of Regulatory
Enforcement, in addition to other rights set forth herein.
37 See 47 CFR 1.80(b). 
38 See 47 U.S.C. 503(b)(2)(E); 47 CFR 1.80(b)(10).
39 47 U.S.C. 154(i), (j).
40 47 CFR 17.6(a), 17.21(a), 17.47(a), 17.48(a), 17.57.
41 47 U.S.C. 154(i), 154(j), 403.
6
Federal Communications Commission DA 22-325

of the Commissions rules and be substantially in the form set forth therein.42 The FCC must receive the
response within 30 calendar days of the release date of this Citation and Order.
21. IT IS FURTHER ORDERED that a copy of this Citation and Order shall be sent by
first class mail and certified mail, return receipt requested, to Patricia Nelson, Registered Agent for
Massey, Wood and West, Inc. and MWW Realty Corp., 1713 Westwood Ave., Richmond, Virginia
23227. 

FEDERAL COMMUNICATIONS COMMISSION




David C. Dombrowski
Regional Director, Region One
Enforcement Bureau
Federal Communications Commission



42 47 CFR 1.16.
7