Click here for Adobe Acrobat version

******************************************************** 
                      NOTICE
********************************************************

This document was converted from a PDF version

Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.

All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.

Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.

If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.

*****************************************************************



Federal Communications Commission
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
BellSouth Telecommunications, LLC d/b/a ) Proceeding No. 20-276
AT&T Florida, ) Bureau ID No. EB-20-MD-003
)
Complainant, )
)
v. )
)
Duke Energy Florida, LLC, )
)
Defendant. )
ERRATUM
Released: September 10, 2021
By the Chief, Market Disputes Resolution Division, Enforcement Bureau:
On August 27, 2021, the Enforcement Bureau released a Memorandum Opinion and Order
(MO&O), DA 21-1008, in the above-captioned proceeding. This Erratum corrects footnote 135 on page
19 of the MO&O to read as follows:
"135 See Verizon Maryland, 35 FCC Rcd at 13618, para. 26 (finding utility had bargaining
leverage where a four-to-one pole ownership disparity meant that the incumbent LEC would be
required to relocate four times the facilities if the parties extracted themselves from their joint use
agreement). Duke's expert states that, if both parties were to furnish and install poles to replace
those to which they attach under the JUA, the total annualized cost to AT&T would be
{[ ]} (representing the cost to replace the 62,363 Duke poles to which AT&T is
attached), while the annualized cost to Duke would be {[ ]} (representing the cost to
replace the 5,233 AT&T poles to which Duke is attached). See Metcalfe Answer Aff. at 9-10,
paras. 18-20 and Exh. E-2 at 1."