Click here for Adobe Acrobat version
********************************************************
NOTICE
********************************************************
This document was converted from a PDF version
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Federal Communications Commission DA 21-1278
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
)
Jackson Energy Authority ) File No.: EB-SED-21-00032311
) CD Acct. No.: 202232100004
) FRN: 0008197303
)
)
ORDER
Adopted: October 14, 2021 Released: October 14, 2021
By the Associate Chief, Enforcement Bureau:
1. The Enforcement Bureau of the Federal Communications Commission (Commission) has
entered into a Consent Decree to resolve its investigation into whether Jackson Energy Authority (Jackson
Energy) timely filed annual reliability certifications regarding its 911 circuit auditing, central office
backup power, and diverse network monitoring. This certification is designed to ensure that covered 911
service providers have taken reasonable measures to provide reliable 911 service by either implementing
industry-backed "best practices" or alternative measures that are reasonably sufficient to ensure reliable
911 service.1
0F To settle this matter, Jackson Energy admits that it failed to timely file its 2019 and 2020
annual 911 reliability certifications, will implement a compliance plan, and will pay a $6,000 civil
penalty.
2. After reviewing the terms of the Consent Decree and evaluating the facts before us, we
find that the public interest would be served by adopting the Consent Decree and terminating the
referenced investigation regarding Jackson Energy's compliance with section 9.19(c) of the
Commission's rules.2
1F
3. In the absence of material new evidence relating to this matter, we do not set for hearing
the question of Jackson Energy's basic qualifications to hold or obtain any Commission license or
3
authorization.2F
4. Accordingly, IT IS ORDERED that, pursuant to section 4(i) of the Act3F4 and the
authority delegated by sections 0.111 and 0.311 of the Commission's rules,5
4F the attached Consent Decree
IS ADOPTED and its terms incorporated by reference.
5. IT IS FURTHER ORDERED that the above-captioned matter IS TERMINATED in
accordance with the terms of the attached Consent Decree.
1
See Improving 911 Reliability; Reliability and Continuity of Communications Networks, Including Broadband
Technologies, PS Docket Nos. 13-75 and 11-60, Report and Order, 28 FCC Rcd 17476, 17477, para. 1 (2013).
2
47 CFR S: 9.19(c).
3
See 47 CFR S: 1.93(b).
4
47 U.S.C. S: 154(i).
5
47 CFR S:S: 0.111, 0.311.
Federal Communications Commission DA 21-1278
6. IT IS FURTHER ORDERED that a copy of this Order and Consent Decree shall be
sent by first class mail and certified mail, return receipt requested, to Jim Ferrell, President and CEO,
Jackson Energy Authority, 250 N. Highland Avenue, Jackson, TN 38301-6201, and to Bruce E. Beard,
Cinnamon Mueller LLC, 1714 Deer Track Trail-Suite 230, St Louis, MO 63131.
FEDERAL COMMUNICATIONS COMMISSION
Jeremy D. Marcus
Associate Chief
Enforcement Bureau
2
Federal Communications Commission DA 21-1278
Before the
Federal Communications Commission
Washington, D.C. 20554
In the Matter of )
) File No.: EB-SED-21-00032311
Jackson Energy Authority ) CD Acct. No.: 202232100004
) FRN: 0008197303
)
)
)
CONSENT DECREE
1. The Enforcement Bureau of the Federal Communications Commission and Jackson
Energy Authority (Jackson Energy or Company), by their authorized representatives, hereby enter into
LQYXP:XUD(VH%QIQWUWPKHWRUHHHRIWPLLFQJQDHSXUSRVIWKHRUQWUHHFHH'RQV&WKLV estigation into whether
1
Jackson Energy violated section 9.19(c) of the Rules by its failure to timely file an annual 911 reliability
certification for 2019 and 2020, which were due by October 15, 2019, and October 15, 2020, respectively.
The Commission requires a covered 911 service provider to file an annual reliability certification
regarding its 911 circuit auditing, central office backup power, and diverse network monitoring, and attest
to whether it has met its obligation to use reasonable measures to mitigate the risk of a 911 service
failure.2 These requirements are designed to improve the reliability and resiliency of 911
communications networks nationwide by requiring that 911 service providers take reasonable measures to
provide reliable 911 service by either implementing certain industry-bacE\RU'VHWSULFFDWVEH^3GNH
implementing alternative measures that are reasonably sufficient to ensure reliable 911 service, as
3
evidenced by the annual reliability certification. To resolve this matter, Jackson Energy admits that it
violated the CommissD\SDLOZiOQGDQSODHRPQFSOLFDDQWLPPHSOLHOZOUVXOHRQP:V $6,000 civil penalty.
I. DEFINITIONS
2. For the purposes of this Consent Decree, the following definitions shall apply:
4
(a) WLRQVFHQVV'DPHVXOH5 ^3 -9.20 of the Rules and other Communications Laws
governing provision of 911 services.
(b) W'F$^3 means the Communications Act of 1934, as amended.5
(c) QWHRQV&WKLRIVUWHPVWKHGRSWLQJD XXUDH% WKHRIRUUGHQ D QV DPH U2UGHGRSW'L$QJ^3
1
47 CFR S: 9.19(c). See Implementing KariP: s Law and Section 506 of RAY BAUM'S Act; Inquiry Concerning 911
Access, Routing, and Location in Enterprise Communications Systems; Amending the Definition of Interconnected
VoIP Service in Section 9.3 of the Commission's Rules, PS Docket Nos. 18-261 and 17-239, GN Docket No. 11-117,
Report and Order, 34 FCC Rcd 6607, 6699, paras. 235-36 (2019), consolidating the RQLVVVP:L&RPP existing 911
rules into a single rule part.
2
See Improving 911 Reliability; Reliability and Continuity of Communications Networks, Including Broadband
Technologies, PS Docket Nos. 13-75 and 11-60, Report and Order, 28 FCC Rcd 17476 (2013) (911 Reliability
Certification Order); Improving 911 Reliability; Reliability and Continuity of Communications Networks, Including
Broadband Technologies, PS Docket Nos. 13-75 and 11-60, Order on Reconsideration, 30 FCC Rcd 8650, 8651,
para. 2 (2015).
3
911 Reliability Certification Order, 28 FCC Rcd at 17477, para. 1.
4
47 CFR S:S: 9.1 +- 9.20.
5
47 U.S.C. S: 151 et seq.
Federal Communications Commission DA 21-1278
Decree without change, addition, deletion, or modification.
(d) WLRPRQVDPXQLF&UOGH)DHWKHRIXXUD(H% QIQWQVWPKHRUHDHPHF X'XUD H% ^3
Commission.
(e) RXQWFFUQXPDEHQVDPHR1'W'FF&$^3 202232100004, associated with payment
obligations described in paragraph 17 of this Consent Decree.
(f) OODQGDLRQVRPPLV& WLRPRQVDPXQLF&WKHUOGH)DQ'HDP&H)&^3 QG D LRQ' VRPPLV& ^3
of its bureaus and offices.
(g) WWKHF$OWW\LKHYHFROOHFQV'DPHVZD / WLRPRQVDPXQLF&^3 Rules, and the published
and promulgated orders and decisions of the Commission to which Jackson Energy
is subject by virtue of its business activities, including but not limited to the 911
Rules.
(h) SUWREOQGRJULLPRQVJDDDHRPQFSOLFD QVWKHDPH 3Q'ODHRPQFSOLD& ^3 procedures
described in this Consent Decree at paragraph 12.
(i) QWVRIJHDQGDOODVHPSOR\HH QVDPH '(VUHPGSORYHR\HH&^3 Jackson Energy who
perform, supervise, oversee, or manage the performance of, duties that relate to the
Q\P:RPSDV& responsibilities under the Communications Laws, including the 911
Rules.
(j) QGDXXUDH%WKHERWKKKLFZWHGDE\ WKH QVDPH 'WH(D'^3 IWILYHF H Jackson Energy have
signed the Consent Decree and the Bureau has released an Adopting Order.
(k) LQXXUDH%WKHE\GHQFRPPHFWWLLRQJDVLQYH WKH QVDPH WWLLRQ'JD,V^3QYH File No. EB-
SED-21-00032311 regarding whether Jackson Energy violated the 911 Rules.
(l) (UQHRQJ\-NV^3FD RU' ^3 QVDPHQ\'RPSD& Jackson Energy Authority, its affiliates,
subsidiaries, predecessors-in-interest, and successors-in-interest.
(m) QGDGXUSUVHUHWRFRSHLQJDULQWOUHQDQGDWGD V WKH QVDPH ' 3GXUUUVWHSHLHQJ2RFD ^3
compliance policies established by Jackson Energy to implement the Compliance
Plan.
(n) QVDPH'U3D^3VWLH Jackson EnergyDU3D^3W\LV'KKLFZ RIKFDHXXUDH%WKHQGD
(o) RIRGH&WKHRILWOH7 LQIRXQGUWLJXORQVDHLRQP: VVRPPLV& QVW'KHDPHVXOH 5 ^3
Federal Regulations.
II. BACKGROUND
3. Under section 9.19(c) of the Rules, covered 911 service providers must file an annual
reliability certification regarding its 911 circuit auditing, central office backup power, and diverse
network monitoring.6 Through this annual reliability certification the provider must attest to whether it
has met its obligation to implement specified best practices or reasonable alternative measures to mitigate
the risk of a 911 service failure, or explain why a requirement is not applicable.7
4. The Company did not timely file its certifications for 2019 and 2020, which were due by
8
October 15, 2019 and October 15, 2020 respectively. On November 12 and November 18, 2020, the
6
47 CFR S: 9.19(c).
7
Id.; see also 911 Reliability Certification Order, 28 FCC Rcd at 19492, para 48.
8
See Public Safety and Homeland Security Bureau Announces Availability of 911 Reliability Certification System
for Annual Reliability Certifications, PS Docket Nos. 13-75 and 11-60, Public Notice, 34 FCC Rcd 6490 (PSHSB
2019); Public Safety and Homeland Security Bureau Announces Availability of 911 Reliability Certification System
for Annual Reliability Certifications, PS Docket Nos. 13-75 and 11-60, Public Notice, 35 FCC Rcd 8082 (PSHSB
2
Federal Communications Commission DA 21-1278
XXUDXUH%F6LHW\QGODRPH+QGDI6WD\H3XEOLFLRQP:VVRPPLV& (PSHSB) contacted Jackson Energy via e-
9
mail regarding its 2020 911 certification. The Company filed a complete 2020 911 reliability
certification on November 18, 2020 (34 days after it was due to be filed). Thereafter, PSHSB referred
this matter to the Enforcement Bureau for appropriate action. On May 26, 2021WUF6SHXPXP:XUDVH%WKH
10
Enforcement Division sent a Letter of Inquiry (LOI) to Jackson Energy.
5. On July 27, 2021, Jackson Energy submitted responses to requested information along
11
with attachments and an accompanying affidavit. Jackson Energy stated, under penalty of perjury, that
it provides non-emergency common 10 digit dialing telephone numbers to Public Safety Answering
Points (PSAPs), and that it failed to submit the 2019 annual reliability certification and failed to submit
12
the 2020 annual reliability certification until November 18, 2020. It stated further that it now
13
understands that certification as to back-up power reliability is required for its headend that serves the
non-emergency numbers to PSAPs. The Company explained that it filed a 911 reliability certification in
2017 and believed it was a one time filing but now understands its obligations under the 911 Rules.
Jackson Energy also noted that neither it nor its affiliates have ever received an official notice or penalty
from the Commission regarding a potential violation of the Act or ULRQP:VVRPPLV& ules. To settle this
matter, Jackson Energy and the Bureau enter into this Consent Decree and agree to the following terms
and conditions.
III. TERMS OF AGREEMENT
6. Adopting Order. The provisions of this Consent Decree shall be incorporated by the
Bureau in an Adopting Order.
7. Jurisdiction. Jackson Energy agrees that the Bureau has jurisdiction over it and the
matters contained in this Consent Decree and has the authority to enter into and adopt this Consent
Decree.
8. Effective Date; Violations. The Parties agree that this Consent Decree shall become
effective on the Effective Date as defined herein. As of the Effective Date, the Parties agree that this
Consent Decree shall have the same force and effect as any other order of the Commission.
9. Termination of Investigation. In express reliance on the covenants and representations
in this Consent Decree and to avoid further expenditure of public resources, the Bureau agrees to
terminate the Investigation. In consideration for the termination of the Investigation, Jackson Energy
agrees to the terms, conditions, and procedures contained herein. The Bureau further agrees that, in the
absence of new material evidence, it will not use the facts developed in the Investigation through the
Effective Date, or the existence of this Consent Decree, to institute any new proceeding on its own motion
2020)DWSDORQWUHL OR QR QLVVV P: L &WR KPP H Q X JLV \ O D O F LRUQHFHWOHGIOELHGKVORXRQLIFFWDHWWULL\LDOLLHEOU7KH
https://apps2.fcc.gov/rcs911/.
9
See E-mail correspondence from Ryan Hedgpeth, Telecommunications Systems Specialist, Cybersecurity and
Communications Resilience Division, FCC Public Safety and Homeland Security Bureau, to Clinton Lee, Headend
Manager, Jackson Energy Authority (Nov. 12, 2020, 11:43 EDT) (on file in EB-SED-21-00032311); E-mail
correspondence from Ryan Hedgpeth, Telecommunications Systems Specialist, Cybersecurity and Communications
Resilience Division, FCC Public Safety and Homeland Security Bureau, to Clinton Lee, Headend Manager, Jackson
Energy Authority (Nov. 18, 2020, 10:20 EDT) (on file in EB-SED-21-00032311).
10
See Letter of Inquiry from Elizabeth Y. Mumaw, Chief, Spectrum Enforcement Division, FCC Enforcement
Bureau, to Teresa Cobb, General Counsel, Jackson Energy Authority (May 26, 2021) (on file in EB-SED-21-
00032311).
11
See E-mail correspondence from Bruce Beard, Managing Partner, Cinnamon Mueller, to Mark DeSantis, Attorney
Advisor, Spectrum Enforcement Division, FCC Enforcement Bureau (July 27, 2021, 16:50 EDT) (on file in EB-
SED-21-00032311).
12
Id.
13
47 CFR S: 9.19(c)(2).
3
Federal Communications Commission DA 21-1278
against Jackson Energy concerning the matters that were the subject of the Investigation, or to set for
hearing the question of (UQHRQJ\P:-VNVFD basic qualifications to be a Commission licensee or hold
Commission licenses or authorizations based on the matters that were the subject of the Investigation.14
10. Admission of Liability. Jackson Energy admits for the purpose of this Consent Decree
and for Commission civil enforcement purposes, and in express reliance on the provisions of paragraph 9
herein, that its actions, outlined in paragraphs 4-5 herein, violated the 911 Rules.
11. Compliance Officer. Within thirty (30) calendar days after the Effective Date, Jackson
Energy shall designate a senior corporate manager with the requisite corporate and organizational
authority to serve as Compliance Officer and to discharge the duties set forth below. The person
designated as the Compliance Officer shall be responsible for developing, implementing, and
administering the Compliance Plan and ensuring that Jackson Energy complies with the terms and
conditions of the Compliance Plan and this Consent Decree. In addition to the general knowledge of the
Communications Laws necessary to discharge his or her duties under this Consent Decree, the
Compliance Officer shall have specific knowledge of the 911 Rules prior to assuming his/her duties.
12. Compliance Plan. For purposes of settling the matters set forth herein, Jackson Energy
agrees that it shall within sixty (60) calendar days after the Effective Date, develop and implement a
Compliance Plan designed to ensure future compliance with the Communications Laws and with the
terms and conditions of this Consent Decree. With respect to the 911 Rules, Jackson Energy will
implement, at a minimum, the following procedures.
(a) Operating Procedures. Within thirty (30) calendar days after the Effective
Date, the Company shall establish Operating Procedures that all Covered
Employees must follow to help ensure the CompanyWKHLWZKHRPQFSOLFDP:V 911
Rules. The CompanyOOKDV3GXUUUVWHSHLHQJ2RFDP:V include internal procedures
and policies specifically designed to ensure that the Company timely files
required annual 911 reliability certifications. The Company shall also develop a
Compliance Checklist that describes the steps that a Covered Employee must
follow to ensure compliance with the 911 Rules.
(b) Compliance Manual. Within sixty (60) calendar days after the Effective Date,
the Compliance Officer shall develop and distribute a Compliance Manual to all
Covered Employees. The Compliance Manual shall explain the 911 Rules and
set forth the Operating Procedures that Covered Employees shall follow to help
ensure the Q\P:RPSDV& compliance with the 911 Rules. The Company shall
periodically review and revise the Compliance Manual as necessary to ensure
that the information set forth therein remains current and complete. The
Company shall distribute any revisions to the Compliance Manual promptly to all
Covered Employees.
(c) Compliance Training Program. The Company shall establish and implement a
Compliance Training Program on compliance with the 911 Rules and the
Operating Procedures. The Compliance Training Program shall address, at a
minimum: (i) the annual 911 reliability certification rules; (ii) required best
practices to be followed throughout the year and reported on the annual 911
reliability certification, including circuit auditing, backup power, and network
monitoring;15 (iii) any alternative measures that are or will be reported on the
annual 911 reliability certification;16 (iv) any explanation as to why a requirement
that is or will be reported on the annual 911 reliability certification does not
14
See 47 CFR S: 1.93(b).
15
47 CFR S: 9.19(c)(1)-(3).
16
47 CFR S: 9.19(b).
4
Federal Communications Commission DA 21-1278
apply;17 and (v) the potential regulatory consequences of failing to properly file
the annual 911 reliability certification. As part of the Compliance Training
Program, Covered Employees shall be advised of the WRWREOLLRQJDQ\P:RPSDV&
report any noncompliance with the 911 Rules under paragraph 13 of this Consent
Decree and shall be instructed on how to disclose noncompliance to the
Compliance Officer. All Covered Employees shall be trained pursuant to the
Compliance Training Program within sixty (60) calendar days after the Effective
Date, except that any person who becomes a Covered Employee at any time after
the initial Compliance Training Program shall be trained within thirty (30)
calendar days after such person becomes a Covered Employee. The Company
shall repeat compliance training on an annual basis and shall periodically review
and revise the Compliance Training Program as necessary to ensure that it
remains current and complete and to enhance its effectiveness.
13. Reporting Noncompliance. The Company shall report any noncompliance with the 911
Rules and with the terms and conditions of this Consent Decree within fifteen (15) calendar days after
discovery of such noncompliance. Such reports shall include a detailed explanation of: (i) each instance
of noncompliance; (ii) the steps that the Company has taken or will take to remedy such noncompliance;
(iii) the schedule on which such remedial actions will be taken; and (iv) the steps that the Company has
taken or will take to prevent the recurrence of any such noncompliance. All reports of noncompliance
shall be electronically submitted to mark.desantis@fcc.gov with a copy to EB-SED-Response@fcc.gov.
14. Compliance Reports. The Company shall file compliance reports with the Commission
ninety (90) calendar days after the Effective Date, twelve (12) months after the Effective Date, twenty-
four (24) months after the Effective Date, and thirty-six (36) months after the Effective Date.
(a) Each Compliance Report shall include a Q\P:RPSDV&WUKHRIFLSWLRQVGHGLOWHDGH
efforts during the relevant period to comply with the terms and conditions of this
Consent Decree and the 911 Rules. In addition, each Compliance Report shall
include a certification by the Compliance Officer, as an agent of and on behalf of
the Company, stating that the Compliance Officer has personal knowledge that
the Company: (i) has established and implemented the Compliance Plan; (ii) has
utilized the Operating Procedures since the implementation of the Compliance
Plan; and (iii) is not aware of any instances of noncompliance with the terms and
conditions of this Consent Decree, including the reporti