Click here for Adobe Acrobat version
********************************************************
NOTICE
********************************************************
This document was converted from a PDF version
Content from the original version of the document such as
headers, footers, footnotes, endnotes, graphics, and page numbers
will not show up in this text version.
All text attributes such as bold, italic, underlining, etc. from the
original document will not show up in this text version.
Features of the original document layout such as
columns, tables, line and letter spacing, pagination, and margins
will not be preserved in the text version.
If you need the complete document, download the
Microsoft Word or Adobe Acrobat version.
*****************************************************************
Federal Communications Commission DA 20-1316
Before the
Federal Communications Commission
Washington, DC 20554
In the Matter of )
)
Telxius Cable USA, Inc., Telxius Cable Puerto ) File No.: EB-SED-20-00030856
Rico, Inc., and Telxius Cable America, S.A ) CD Acct. No.: 202132100004
) FRN: 0006650618; 0022340921; and
) 0026263673
)
ORDER
Adopted: November 12, 2020 Released: November 13, 2020
By the Deputy Chief, Enforcement Bureau:
1. Owners and operators of submarine cables and associated cable landing stations that
connect with the United States must obtain a license from the Federal Communication Commission
(Commission) prior to operation, and must submit a modification to the existing license prior to
connecting and operating any additional cable landing stations.1 Entities that unilaterally connect
submarine cables with the United States without Commission authorization jeopardize the country’s
security, competition, and the environment. The Enforcement Bureau (Bureau) has therefore entered into
a Consent Decree to resolve the Bureau’s investigation into allegations that Telxius Cable USA, Inc.,
Telxius Cable Puerto Rico, Inc., and Telxius Cable America, S.A (collectively, Telxius) connected
landing points in Ecuador and Peru with the United States without complying with the Cable Landing
License Act of 1921,2 3
and section 1.767 of the Commission’s rules. To settle this matter, Telxius admits
that it failed to obtain Commission authorization to add to its existing license new submarine cable
landing points between Punta Carnero, Ecuador and Mancora, Peru, respectively, and the United States
prior to operation. Telxius agrees that it will implement a robust compliance plan to ensure that it does
not violate these rules in the future and will pay a $35,000 civil penalty. This action will promote the
Commission’s goals of protecting the nation’s security, competition, and the environment by ensuring
that licensees or applicants get approval from the Commission prior to connecting foreign landing points
to the United States.
2. After reviewing the terms of the Consent Decree and evaluating the facts before us, we
find that the public interest would be served by adopting the Consent Decree and terminating the
referenced investigation regarding Telxius’s compliance with the Cable Landing License Act of 1921,4
5
and section 1.767 of the Commission’s rules.
3. In the absence of material new evidence relating to this matter, we do not set for hearing
1
47 CFR § 1.767; see also 47 U.S.C. §§ 34-39. Executive Order No. 10530 delegates to the Commission the
President’s authority under the Cable Landing License Act of 1921, adding that “no such license shall be granted or
revoked by the Commission except after obtaining approval of the Secretary of State and such advice from any
executive branch department or establishment of the Government as the Commission may deem necessary.” Exec.
Order No. 10530 § 5(a), reprinted as amended in 3 U.S.C. § 301.
2
47 U.S.C. §§ 34-39.
3
47 CFR § 1.767.
4
47 U.S.C. §§ 34-39.
5
47 CFR § 1.767.
Federal Communications Commission DA 20-1316
the question of Telxius’s basic qualifications to hold or obtain any Commission license or authorization.6
4. Accordingly, IT IS ORDERED that, pursuant to section 4(i) of the Communications Act
of 1934, as amended,7 and the authority delegated by sections 0.111 and 0.311 of the Commission’s
rules,8
the attached Consent Decree IS ADOPTED and its terms incorporated by reference.
5. IT IS FURTHER ORDERED that the above-captioned matter IS TERMINATED in
accordance with the terms of the attached Consent Decree.
6. IT IS FURTHER ORDERED that a copy of this Order and Consent Decree shall be
sent by email to counsel for Telxius Cable USA, Inc., Telxius Cable Puerto Rico, Inc., and Telxius Cable
America, S.A, Kent D. Bressie, Esq., Harris, Wiltshire & Grannis, LLP.
FEDERAL COMMUNICATIONS COMMISSION
Christopher L. Killion
Deputy Chief
Enforcement Bureau
6
See 47 CFR § 1.93(b).
7
47 U.S.C. § 154(i).
8
47 CFR §§ 0.111, 0.311.
2
Federal Communications Commission DA 20-1316
Before the
Federal Communications Commission
Washington, DC 20554
In the Matter of )
)
Telxius Cable USA, Inc., Telxius Cable Puerto ) File No.: EB-SED-20-00030856
Rico, Inc., and Telxius Cable América, S.A ) CD Acct. No.: 202132100004
) FRN: 0006650618; 0022340921; and
) 0026263673
)
CONSENT DECREE
1. The Cable Landing Licensing Requirements provide that owners and operators of
submarine cables and associated cable landing stations that connect with the United States must obtain a
license from the Commission prior to operation to make sure that licensees meet, among other
requirements, security, competition, and environment-related obligations and requirements. In addition,
for a previously licensed system, the Commission must grant the licensee a modification of the existing
license prior to its connecting and operating any new foreign landing points. In furtherance of these
objectives, the Enforcement Bureau of the Federal Communications Commission and Telxius Cable
USA, Inc., Telxius Cable Puerto Rico, Inc., and Telxius Cable América, S.A (collectively, Telxius), by
their authorized representatives, hereby enter into this Consent Decree, which terminates the Enforcement
Bureau’s investigation into whether Telxius violated the Cable Landing License Act of 1921 and section
1.767 of the Commission’s rules in connection with Telxius’s South America-1 submarine cable system
(SAm-1).1
The violations involve Telxius’s unauthorized operation and failure to file an application with
the FCC before adding landing points in Ecuador and Peru to its existing cable landing license. To
resolve this matter, Telxius agrees to implement a compliance plan and pay a $35,000 civil penalty.
I. DEFINITIONS
2. For the purposes of this Consent Decree, the following definitions shall apply:
(a) “Act” means the Communications Act of 1934, as amended.2
(b) “Adopting Order” means an order of the Bureau adopting the terms of this Consent
Decree without change, addition, deletion, or modification.
(c) “Bureau” means the Enforcement Bureau of the Federal Communications
Commission.
(d) “Cable Landing Licensing Requirements” means the Cable Landing License Act of
1921, Executive Order No. 10530, 47 CFR § 1.767, and other Communications
Laws related to the filing of an application when a modification or amendment of a
previous cable landing license is required.
(e) “CD Acct No.” means account number 202132100004, associated with payment
obligations described in paragraph 17 of this Consent Decree.
(f) “Commission” and “FCC” mean the Federal Communications Commission and all
of its bureaus and offices.
1
See File Nos. SCL-LIC-20000204-00003, SCL-MOD-20061207-00012, SCL-MOD-20180605-00016, SCL-MOD-
20180905-00032, SCL-MOD-20190826-00028
2
47 U.S.C. § 151 et seq.
Federal Communications Commission DA 20-1316
(g) “Communications Laws” means collectively, the Act, the Rules, and the published
and promulgated orders and decisions of the Commission to which Telxius is
subject by virtue of its business activities, including but not limited to the Cable
Landing Licensing Requirements.
(h) “Compliance Plan” means the compliance obligations, program, and procedures
described in this Consent Decree at paragraph 13.
(i) “Covered Employees” means all employees and agents of Telxius who perform,
supervise, oversee, or manage the performance of, duties that relate to Telxius’
responsibilities under the Communications Laws, including the Cable Landing
Licensing Requirements.
(j) “Effective Date” means the date by which both the Bureau and Telxius have signed
the Consent Decree and the Bureau has released an Adopting Order.
(k) “International Bureau” means the International Bureau of the Commission.
(l) “Investigation” means the investigation commenced by the Bureau in EB-SED-20-
00030856 regarding whether Telxius violated the Cable Landing Licensing
Requirements.
(m) “LOI” means the Letter of Inquiry issued by the Bureau to Telxius on April 9, 2020
in connection with Telxius’s operation and filing of applications related to Telxius’
SAm-1.
(n) “Operating Procedures” means the standard internal operating procedures and
compliance policies established by Telxius to implement the Compliance Plan.
(o) “Parties” means Telxius and the Bureau, each of which is a “Party.”
(p) “Rules” means the Commission’s regulations found in Title 47 of the Code of
Federal Regulations.
(q) “SAm-1” means Telxius’ South America-1 submarine cable system.
(r) “Telxius or Company” means Telxius Cable USA, Inc., Telxius Cable Puerto Rico,
Inc., and Telxius Cable América, S.A and its affiliates, subsidiaries, predecessors-in-
interest, and successors-in-interest.
II. BACKGROUND
3. Pursuant to Executive Order No. 10530, submarine cables are licensed by the FCC.3
Section 1.767 of the Rules sets out the requirement that an entity must apply to the Commission to modify
a cable landing license, including the addition of a new landing point.4
Specifically, section 1.767(e) and
(m) requires the filing of an application when a modification or amendment of a previous license is
requested.5
4. Telxius’s SAm-1 is a non-common carrier system that provides communications
connectivity between Florida, Puerto Rico, Argentina, Brazil, Chile, Colombia, the Dominican Republic,
Ecuador, Guatemala, and Peru. During a review of Telxius’s SAm-1 license, the International Bureau
became aware of two landing points, Punta Carnero, Ecuador and Mancora, Peru, that Telxius previously
indicated were operational but were not identified on Telxius’s SAm-1 license. Thereafter, the
3
“The Federal Communications Commission is hereby designated and empowered to exercise, without the
approval, ratification, or other action of the President, all authority vested in the President by the act of May 27,
1921 . . . including the authority to issue, withhold, or revoke licenses to land or operate submarine cables in the
United States . . . .” Executive Order No. 10530 § 5(a).
4
47 CFR § 1.767.
5
47 CFR §§ 1.767(e), (m).
2
Federal Communications Commission DA 20-1316
International Bureau notified Telxius’s current counsel of the omission of the landing points from the
SAm-1 license. The International Bureau subsequently referred the matter to the Bureau for
investigation.
5. On August 26, 2019, Telxius filed both an application to modify its cable landing license
authority to authorize the omitted cable landing segments and an application to request special temporary
authority (STA) to operate those segments pending grant of the modification.6 The Commission granted
the STA application on September 5, 2019.7 On March 3, 2020, the Commission granted Telxius’
8
modification application.
6. On April 9, 2020, the Bureau’s Spectrum Enforcement Division issued an LOI to Telxius
seeking information regarding possible violations of the Cable Landing Licensing Requirements.9 In its
May 9, 2020 response to the LOI, Telxius acknowledged that it inadvertently failed to modify its SAm-1
license prior to commencing operation between Punta Carnero, Ecuador, Mancora, Peru, and the United
States on October 31, 2007.10 To settle this matter, the Bureau and Telxius enter into this Consent Decree
and agree to the following terms and conditions.
III. TERMS OF AGREEMENT
7. Adopting Order. The provisions of this Consent Decree shall be incorporated by the
Bureau in an Adopting Order.
8. Jurisdiction. Telxius agrees that the Bureau has jurisdiction over it and the matters
contained in this Consent Decree and has the authority to enter into and adopt this Consent Decree.
9. Effective Date; Violations. The Parties agree that this Consent Decree shall become
effective on the Effective Date as defined herein. As of the Effective Date, the Parties agree that this
Consent Decree shall have the same force and effect as any other order of the Commission.
10. Termination of Investigation. In express reliance on the covenants and representations
in this Consent Decree and to avoid further expenditure of public resources, the Bureau agrees to
terminate the Investigation. In consideration for the termination of the Investigation, Telxius agrees to the
terms, conditions, and procedures contained herein. The Bureau further agrees that, in the absence of new
material evidence, it will not use the facts developed in the Investigation through the Effective Date, or
the existence of this Consent Decree, to institute any new proceeding on its own motion against Telxius
concerning the matters that were the subject of the Investigation, or to set for hearing the question of
Telxius’s basic qualifications to be a Commission licensee or hold Commission licenses or authorizations
based on the matters that were the subject of the Investigation.11
11. Admission of Liability. Telxius admits for the purpose of this Consent Decree and for
Commission civil enforcement purposes, and in express reliance on the provisions of paragraph 10 herein,
that its failure to modify its SAm-1 license prior to commencing operation between Punta Carnero,
Ecuador and Mancora, Peru violated the Cable Landing Licensing Requirements.
6
See File No. SCL-STA-20190826-00028 and SCL-STA-20190826-00029.
7
See SCL-STA-20190826-00029.
8
See Actions Taken Under Cable Licensing Act, Public Notice, DA 20-1018 (IB Mar. 6, 2020).
9
Letter of Inquiry from JoAnn Lucanik, Deputy Chief, Spectrum Enforcement Division, FCC Enforcement Bureau,
to Kent Bressie, Harris, Wiltshire & Grannis LLP, Counsel for Telxius (Apr. 9, 2020) (on file in EB-SED-20-
00030856).
10 Response to Letter of Inquiry, from Kent Bressie, Harris, Wiltshire & Grannis LLP, Counsel for Telxius, to
Marlene H. Dortch, Secretary, Federal Communications Commission (May 29, 2020) (on file in EB-SED-20-
00030856).
11 See 47 CFR § 1.93(b).
3
Federal Communications Commission DA 20-1316
12. Compliance Officer. Within thirty (30) calendar days after the Effective Date, Telxius
shall designate a senior corporate manager with the requisite corporate and organizational authority to
serve as a Compliance Officer and to discharge the duties set forth below. The person designated as the
Compliance Officer shall be responsible for developing, implementing, and administering the Compliance
Plan and ensuring that Telxius complies with the terms and conditions of the Compliance Plan and this
Consent Decree. In addition to the general knowledge of the Communications Laws necessary to
discharge his or her duties under this Consent Decree, the Compliance Officer shall have specific
knowledge of the Cable Landing Licensing Requirements prior to assuming his/her duties.
13. Compliance Plan. For purposes of settling the matters set forth herein, Telxius agrees
that it shall, within sixty (60) calendar days after the Effective Date, develop and implement a
Compliance Plan designed to ensure future compliance with the Cable Landing Licensing Requirements
and with the terms and conditions of this Consent Decree. Telxius will implement, at a minimum, the
following procedures:
(a) Operating Procedures. Within thirty (30) calendar days after the Effective Date,
Telxius shall establish Operating Procedures (or amend any existing Operating
Procedures) that all Covered Employees must follow to help ensure Telxius’s
compliance with the Cable Landing Licensing Requirements. Telxius’s Operating
Procedures shall include internal procedures and policies specifically designed to
ensure that modification filings are made and approved by the FCC prior to
commencement of operation. Telxius shall also develop a Compliance Checklist
that describes the steps that a Covered Employee must follow to ensure compliance
with the Cable Landing Licensing Requirements.
(b) Compliance Manual. Within sixty (60) calendar days after the Effective Date, the
Compliance Officer shall develop a Compliance Manual (or amend the existing
Compliance Manual) and distribute it to all Covered Employees. The Compliance
Manual shall explain the Cable Landing Licensing Requirements and set forth the
Operating Procedures that Covered Employees shall follow to help ensure Telxius’s
compliance with the Cable Landing Licensing Requirements. Telxius shall
periodically review and revise the Compliance Manual as necessary to ensure that
the information set forth therein remains current and accurate. Telxius shall
distribute any revisions to the Compliance Manual promptly to all Covered
Employees.
(c) Compliance Training Program. Telxius shall establish and implement a
Compliance Training Program (or amend the existing Compliance Training
Program) on compliance with the Cable Landing Licensing Requirements and the
Operating Procedures. As part of the Compliance Training Program, Covered
Employees shall be advised of Telxius’s obligation to report any noncompliance
with the Cable Landing Licensing Requirements under paragraph
14 of this Consent
Decree and shall be instructed on how to disclose noncompliance to the Compliance
Officer. All Covered Employees shall be trained pursuant to the Compliance
Training Program within sixty (60) calendar days after the Effective Date, except
that any person who becomes a Covered Employee at any time after the initial
Compliance Training Program shall be trained within thirty (30) calendar days after
the date such person becomes a Covered Employee. Telxius shall repeat compliance
training on an annual basis and shall periodically review and revise the Compliance
Training Program as necessary to ensure that it remains current and complete and to
enhance its effectiveness.
14. Reporting Noncompliance. Telxius shall report any noncompliance with the Cable
Landing Licensing Requirements and with the terms and conditions of this Consent Decree within fifteen
(15) calendar days after discovery of such noncompliance. Such reports shall include a detailed
explanation of: (i) each instance of noncompliance; (ii) the steps that Telxius has taken or will take to
4
Federal Communications Commission DA 20-1316
remedy such noncompliance; (iii) the schedule on which such remedial actions will be taken; and (iv) the
steps that Telxius has taken or will take to prevent the recurrence of any such noncompliance. All reports
of noncompliance shall be submitted electronically to Chief, Spectrum Enforcement Division,
Enforcement Bureau, Federal Communications Commission at EB-SED-Response@fcc.gov, and to Josh
Zeldis, Spectrum Enforcement Division, Enforcement Bureau, Federal Communications Commission at
Josh.Zeldis@fcc.gov.
15. Compliance Reports. Telxius shall file compliance reports with the Commission ninety
(90) calendar days after the Effective Date, twelve (12) months after the Effective Date, twenty-four (24)
months after the Effective Date, and thirty-six (36) months after the Effective Date.
(a) Each Compliance Report shall include a detailed description of Telxius’s efforts
during the relevant period to comply with the terms and conditions of this Consent
Decree and the Cable Landing Licensing Requirements. In addition, each
Compliance Report shall include a certification by the Compliance Officer, as an
agent of and on behalf of Telxius, stating that the Compliance Officer has personal
knowledge that Telxius: (i) has established and implemented the Compliance Plan;
(ii) has utilized the Operating Procedures since the implementation of the
Compliance Plan; and (iii) is not aware of any instances of noncompliance with the
terms and conditions of this Consent Decree, including the reporting obligations set
forth in paragraph 14 of this Consent Decree.
(b) The Compliance Officer’s certificatio